4. INSTALLATION
4-3. Installing the flange nut
4-4. Installing the control box
Note: When opening the cover, hold it securely so that it does not fall down.
1. Remove the 12 screws (1), and then open the covers (main P.C. board mounting plate (2) and sub P.C. board
mounting plate (3)).
2. Install the control box with the bolts (4), cushions (5), cushion collars (6), rubber collars (7), flat washers (8) and nuts
(9) as shown in the illustration. At this time, leave a gap of approximately 2 mm between the work table and the top of
the box.
3. Close the covers (main P.C. board mounting plate (2) and sub P.C. mounting plate (3)), and provisionally tighten
them with the screws (1). (They will be opened again when the cords are connected.)
9
Install the four flange nuts (1) to the underside of the
work table.
Note:
When the machine head is positioned horizontally,
some flange nut installation locations may be
inaccessible after the control box has been in-
stalled.
3857Q
HE-800A
3858Q