Table 2-6 Factory-Integrated Installation Checklist (continued)
Procedure
In-process
Completed
Set up network services (if
required)
Enable Instant Capacity (if
available)
Final inspection of circuit boards
Final inspection of cabling
Area cleaned and debris and
packing materials disposed of
Tools accounted for
Parts and other items disposed
of
Make entry in Gold Book
(recommended)
Customer acceptance and signoff
(if required)
Cabling and Powering On the Server
85