CHAPTER 1 RCI Build Procedure
XSCF> setrci -c set 2
The command completed successfully
7
Execute the setrci -c addconfig command on main unit B to expand the RCI
configuration.
XSCF> setrci -c addconfig
The command completed successfully
8
Display the RCI status by executing the setrci -c statcommand on main unit A.
XSCF> setrci -c stat
HOST
address 000102ff
Active
LIST
address pwr alm I/F sys-phase ctgry dev-cls sub-cls tm-out
000101ff OFF - ACT
000102ff OFF - ACT
003001ff OFF - ACT
003002ff OFF - ACT
The command completed successfully
9
Verify that the added main unit is incorporated.
1.3.5

Connection of RCI

According to the following procedure, connect different units with RCI cables by
using a daisy-chain connection.
1
Prepare RCI branching connectors and RCI terminating resistors.
All of them are supplied with the main unit.
2
Connect the main unit and I/O units with RCI cables (see
Figure
1.10.)
1
Connect the RCI branching connector (1) to the RCIport on an XSCF unit of the
main unit.
2
Connect the RCI branching connector and the RCI port of an I/O unit with an RCI
cable (2) by using a daisy-chain connection.
1-10
--
host 0001 0b
--
host 0001 0b
--
disk 0400 04
--
disk 0400 04
-
-
-
-
Figure 1.9
and
C120-E361-04EN