iNSTALLATiON
START-UP
ADJUSTMENTS
Section
2 - Post Installation
Start-up
and Adiustments
1S kW Generator
Z_ Proceed with caution!
Generator
power voltage
Js now supplied
to the transfer
switch,
Contact
with live transfer
switch parts will result in dan-
gerous and possibly fatal electrkal
shock,
11. Connect
an
accurate
AC voltmeter
and
a fre-
quency
meter
across
transfer
switch
terminal
lugs E 1 and E2. Voltage should
be 242-252
volts;
Kequency
should
read
about
61-63
Hertz.
12. Connect
the AC voltmeter
test
leads
across
ter-
minal
lug E1 and
neutral;
then
across
E2 and
neutral.
In both
cases,
voltage
reading
should
be
121-126
volts AC.
13. Set
the generator's
main
circuit
breaker
to its
OFF (or open) position.
Let the engine
run at no-
load tot a few minutes
to stabilize
internal
engine
generator
temperatures.
14. Set the generator's
AUTO/OFF/MANUAL
swifeh to
OFE The engine
should
shut down.
NOTE:
it is important
not
to proceed
until
certain
that
generator
AC voltage
and
frequency
are
correct
and within
the stated
limits.
Oenerally_
if both
AC
frequency
and voltage
are high
or lo_;
the engine
governor
requires
adjustment.
If frequency
is cor-
rect,
but
voltage
is high
or low, the
generator's
voltage
regulator
requires
adjustment.
2.4
GENERATOR
TESTS UNDER
LOAD
To test the generator
set with electrical
loads applied,
proceed
as follows:
1.
Set generator's
main
circuit
breaker
to its OFF
(or open)
position.
2.
Set
the
generator's
AUTO/OFF/MANUAL
switch
to OFE
3.
Turn OFF the utility
power
supply
to the transfer
swifeh,
using
the means
provided
{such as a util-
ity main
line circuit
breaker).
wA.NINc
Z_
Do not attempt
manual transfer
switch opera-
tion until aH power voltage
supplies to the
transfer
switch have been positiveJy turned
off.
Failure to turn off aH power vottage
supplies
will result in extremely
hazardous
and possibly
fatal electrical shock,
4.
Manually
set the transfer
swifeh to the STANDBY
position,
i.e.,
load
terminals
connected
to the
generator's
E 1/E2 terminals.
The transfer
switch
operating
lever should
be down.
5.
Set
the generator's
AUTO/OFF/iVlANUAL
switch
to MANUAL. The
engine
should
crank
and start
irmnediatel_t
lo
G. Let the engine
stabilize
and
warm
tip for a few
minutes.
7.
Set the generator's
main circuit
breaker
to its ON
(or closed)
position.
Loads
are now powered
by
the standby
generator.
8.
Turn ON electrical
loads.
Apply an electrical
load
equal
to the fllll rated wattage/amperage
capacity
of the installed
generator.
9.
Connect
an accurate
AC voltmeter
and a frequen-
cy meter
across
terminal
lugs E 1 and E2. Voltage
should
be
greater
than
230
volts;
frequency
should
be greater
than
58 Hertz.
10. Let the generator
run at full rated
load tot 20-30
minutes.
Listen
for unusual
noises,
vibration
or
other
indications
of abnormal
operation.
Check
ibr oil leaks,
evidence
of overheating,
etc.
11. When
testing
tinder
load
is complete,
turn
OFF
electrical
loads.
12. Set the generator's
nmin
circuit
breakers
to their
OFF (or open) positions.
13. Let the engine
run at no-load
%r a few minutes.
14. Set the AUTO/OFF/MANUAL
switch
to OFE The
engine
should
shut down.
2.5
CHECKINGAUTOMATIC
OPERATmON
To check
the system
for proper
automatic
operation,
proceed
as follows:
1.
Set
the
generator's
main
circuit
breaker
to it's
OFF
(or open)
position.
2.
Check
that
the AUTO/OFF/MANUAL
switch
is set
to OFE
3. Turn OFF
the
utility power supply
to the transfer
switch
using
the means
provided
(such
as a utility
main
line
circuit
breaker).
4.
Manually
set
the
transfer
switch
to the
UTILITY
position,
i.e., load
terminals
connected
to the util-
ity power
source
side.
5.
7him
ON the
utility
power
supply
to the transfer
swifeh,
using
the means
provided
{such
as a util-
ity mata
line circuit
breaker).
G.
Set
the
AUTO/OFF/MANUAL
switch
to
AUTO.
Then
set the
generator's
mata
circuit
breaker
to
its
ON
(or
closed)
position.
The
system
is now
ready
for autonmtic
operation.
7.
Turn
OFF the
utility
power
supply
to the transfer
swifeh.
With
the
AUTO/OFF/MANUAL
swifeh
at AUTO,
the
engtae
should
crank
and
start
when
the utility
source
power
is
turned
OFE
AAer
starting,
the
transfer
swifeh
should
connect
load
circuits
to
the
standby
side.
Let the
system
go through
its entire
automatic
sequence
of operation.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents