Desa G42 Owners Manual And Installation Manual

42" and 50" wood burning masonry fireplace

Advertisement

42" and 50" Wood Burning Masonry Fireplace
oWner's operaTion and insTallaTion Manual
(V)G42/50 - Smooth Face with Insulation
(V)G42R/50R - Smooth Face with Insulation and Bottom Door Rail
(V)G42H/50H - Smooth Face with Insulation and Herringbone Refractory
(V)G42HR/50HR - Smooth Face with Insulation, Bottom Door Rail
and Herringbone Refractory
SAVE THIS BOOK
This book is valuable. In addition to instructing you
on how to install and maintain your appliance, it also
contains information that will enable you to obtain re-
placement parts or accessory items when needed. Keep
it with your other important papers.
This fireplace is approved for use as a wood burning fire-
place or for use with a vented gas log approved to ANS
Z21.60, Z21.84 or RGA 2-72 standards or for use with a vent-
free gas log heater approved to ANS Z21.11.2 standard.
This wood burning fireplace complies with UL127-
CAN/ULS-S610-M87 standard as a FACTORY BUILT
APPLIANCE.
FOR CANADA: The authority having jurisdiction (such
as the municipal building department, fire department,
etc.) should be contacted before installation to deter-
mine the need to obtain a permit.
INSTALLER: Leave this manual with the appliance.
CONSUMER: Retain this manual for future reference.
For more information, visit www.desatech.com

Advertisement

Table of Contents
loading

Summary of Contents for Desa G42

  • Page 1 42" and 50" Wood Burning Masonry Fireplace oWner’s operaTion and insTallaTion Manual (V)G42/50 - Smooth Face with Insulation (V)G42R/50R - Smooth Face with Insulation and Bottom Door Rail (V)G42H/50H - Smooth Face with Insulation and Herringbone Refractory (V)G42HR/50HR - Smooth Face with Insulation, Bottom Door Rail and Herringbone Refractory SAVE THIS BOOK This book is valuable.
  • Page 2: Table Of Contents

    TaBle oF conTenTs Safety Information .......... Glass Door Installation ........1 Specifications ............3 Operation and Maintenance Guidelines .... 13 Fireplace Installation..........5 Technical Service..........14 Venting Installation ..........7 Replacement Parts ..........15 Optional Gas Line Installation......11 Accessories ............16 saFeTy inForMaTion This fireplace is not intended to be WARNING: Improper...
  • Page 3: Specifications

    speciFicaTions 42" MODELS SQUARE CHASE-TOP ROUND TOP TERMINATION TERMINATION 2" CHIMNEY AIRSPACE CLEARANCE TO COMBUSTIBLE MATERIAL NO COMBUSTIBLE MATERIAL ON FACE COMBUSTIBLE WALL BOARD " AIR SPACE BACK AND SIDES OUTSIDE AIR MINIMUM 18" TO PERPENDICULAR SIDEWALL GAS LINE KNOCKOUTS HEARTH EXTENSION 66"...
  • Page 4 speciFicaTions 50" MODELS ROUND TOP TERMINATION SQUARE CHASE-TOP TERMINATION 2" CHIMNEY AIRSPACE CLEARANCE TO COMBUSTIBLE MATERIAL NO COMBUSTIBLE MATERIAL ON FACE COMBUSTIBLE WALL BOARD " AIR SPACE BACK AND SIDES OUTSIDE AIR MINIMUM 18" TO PERPENDICULAR SIDEWALL GAS LINE KNOCKOUTS HEARTH EXTENSION 74"...
  • Page 5: Fireplace Installation

    and depth of the fireplace. Fireplace insTallaTion 3. Set the fireplace directly in front of this open- SELECTING LOCATION ing and slide the unit back until the nailing To determine the safest and most efficient location flanges touch the side framing. for the fireplace, you must take into consideration 4.
  • Page 6: Hearth Extension

    Fireplace insTallaTion MANTELS A mantel may be installed if desired (see Figure 4). Continued Woodwork such as wood trims, mantels or any other HEARTH ExTENSION combustible material projecting from the front face A hearth extension projecting a minimum of 20" must not be placed within 12"...
  • Page 7: Venting Installation

    VenTing insTallaTion LINEAL GAIN PART NO. DESCRIPTION GAIN OPTIONAL OUTSIDE AIR KIT Georgian Fireplace " (MODEL AK4/AK4F) 12-12DM The installation of an outside air kit should be per- Pipe Section " 12-12HT formed during the rough framing of the fireplace 18-12DM due to the nature of it's location.
  • Page 8 2. Chimney weight above offset rests on return VenTing insTallaTion elbow. Straps must be securely nailed to rafters Continued or joists (see Figure 8, details a and b). USING ELBOW OFFSETS (30E-12DM) 3. Maximum length of pipe between supports 1. To achieve desired offset, you may install (return elbow or 12S-12DM) is 6' of angle combinations of 12", 18", 24", 36"...
  • Page 9 VenTing insTallaTion PENETRATING THE ROOF To maintain a 1" clearance to the pipe on a roof Continued with a pitch, a rectangular opening must be cut. 1. Determine the center point through which the pipe will penetrate the roof. 2. Determine the center point of the roof. Pitch Screws is the distance the roof drops over a given span, usually 12".
  • Page 10: Chase Installations

    VenTing insTallaTion CAUTION: Do not seal open- Continued ings on the rooftop flashing. Fol- Storm low the installation instructions Overlap Collar provided with the termination Shingles Top Flashing and Sides Only being used. Cone Nail Only RTL-10D Outer Stainless Perimeter Level of Inner Flue of Flashing...
  • Page 11: Optional Gas Line Installation

    3. Run a 1/2" black iron gas line into the fireplace VenTing insTallaTion through the rear at gas line conduit sleeve (if Continued using a raised platform, add height). Provide sufficient gas line into fireplace chamber for 10 FOOT RULE fitting connection (see Figure 19).
  • Page 12: Glass Door Installation

    opTional gas line glass door insTallaTion insTallaTion Continued IMPORTANT: Install glass door frame before installing glass CAUTION: All gas piping door. and connections must be tested for leaks after the installation INSTALLING DOOR FRAMES is completed. After ensuring 1. Remove screws from smoke shelf (see Figure 20).
  • Page 13: Operation And Maintenance Guidelines

    glass door operaTion and insTallaTion MainTenance Continued guidelines INSTALLING GLASS DOORS GLASS DOORS Spring clips have been installed but some adjust- Glass doors are optional with the fireplace. When ments may be needed. If doors do not close properly fireplace is in operation, doors must be fully or do not appear straight, see Door Adjustment.
  • Page 14: Technical Service

    operaTion and Damper MainTenance Weight guidelines Continued Cleaning Glass Clean glass with any commercial glass cleaner or soap and water. Do not use any abrasive material To Close to clean glass. Do not clean glass with any cool Damper water if glass is still hot from the fire and smoke. A gas line or gas log lighter may be installed for the purpose of installing a vented or vent-free deco- rative gas appliance incorporating an automatic...
  • Page 15: Replacement Parts

    replaceMenT parTs HERRINGBONE BRICK LINER Bottom Front Brick Refractory 111509-01 - VG42H Models 111509-02 - G42H Models STANDARD BRICK LINER 111515-01 - VG50H Models Bottom Front Brick Refractory 111515-02 - G50H Models 111425-01 - VG42 Models Bottom Rear Brick Refractory 111425-02 - G42 Models 111510-01 - VG42H Models 111430-01 - VG50 Models...
  • Page 16: Accessories

    accessories OPTIONAL OUTSIDE AIR KIT FOR SIDEWALL INSTALLATION - AK-4 PN 01576 BI-FOLD GLASS DOOR STORM COLLAR - SC2-1 BDG42 - 42" Black Finish BDG42B - 42" Brushed Brass Finish BDG42P - 42" Platinum Finish FIRESTOP SPACER BDG42PB - 42" Polished Brass Finish FS-10 BD50 - 50"...

Table of Contents