IS_EC2 Lighting Systems 48” or 96” 48” or 96” JUNCTION BOX (BY OTHERS) CANOPY CANOPY POWER CANOPY POWER CORD Figure 1 S. R. L. CORD (OPTIONAL) #8 SCREWS COVER MALE PLUG 1/4-20 BOLT CABLE GRIPPER S. R. L. CORD HANGING CLIP (OPTIONAL) FEMALE PLUG Figure 2...
Page 3
IS_EC2 Lighting Systems Step 1. Installing the Suspension Cables Step 2. Installing the First Fixture Step 3. Installing the Remaining Fixtures Step 4. End of Row We reserve the right to change details of design, materials and finish.
Page 4
IS_EC2 Lighting Systems Step 1. Modifying MASTER Unit NOTE: In some instances some of the wires in the fixture are required to remain uncut. (DALI, SHARING DAYLIGHT SENSOR , ETC.) In this case cut plug from secondary power cord and only cut and tap into the hot and neutral wires in the thru-harness. POWER CORD 1ST POWER DROP 2ND POWER DROP...
IS_EC2 Lighting Systems Installing the ECS400T Ground (Green) Common (White) Hot (Black) Ground (Green) Ground (Green) Building’s Electrical ECS400T System White Relay Common Black Common Installing the ECS100L +24V in N.O. Figure 4 Common (White) Common (White) Ground (Green) Hot (Black) Hot (Black) Ground (Green) Ground (Green)