Download Print this page

Schwinn IC Pro Assembly Manual page 6

Ic bikes
Hide thumbs Also See for IC Pro:

Advertisement

Step 1
Ref. #
Description
1
Frame
A
Front Stabilizer Bar with Wheels and Feet
B
Rear Stabilizer Bar with Feet
46
13mm Hex Bolt
44
Flat Washer
45
13mm Lock Nut
Tools Required
Stamped Steel Combination Wrench
Adjustable wrench or 13mm Socket
ATTENTION
The following steps utilize stainless steel hardware. Stainless
steel hardware is susceptible to "cold welding", also known as
galling, if not handled properly. To reduce the chances for cold
welding, make sure you apply grease to the threads at the end of
the stainless hex bolts #46. When tightening the 13mm lock nuts
#45, turn them at a fairly low rotational speed. High rotational
speeds as well as lack of grease are common causes for cold
welding of stainless steel hardware.
A. Position the Front Stabilizer Bar (A) on the frame bracket as
shown in the illustration.
B. Make sure the adjustable feet are on the bottom and the
transport wheels are facing up and toward the front of the
bike.
C. Attach Front Stabilizer Bar (A) to Frame (1) using two hex
bolts (46), four washers (44), and two lock nuts (45). Tighten
hardware firmly but do not over tighten as deformation of the
stabilizer tube may occur
D. At this time make sure that the adjustable feet with lock nuts
are screwed fully into the stabilizer.
E. Position the Rear Stabilizer Bar (B) on the frame bracket as
shown in the illustration.
F. Make sure the adjustable feet are on the bottom.
G. Attach Rear Stabilizer Bar (B) to Frame (1) using two hex
bolts (46), four washers (44), and two lock nuts (45). Tighten
hardware firmly but do not over tighten as deformation of the
stabilizer tube may occur
H. At this time make sure that the adjustable feet with lock nuts
are screwed fully into the stabilizer.
Assembly
Qty
1
1
1
4
8
4
1
1
Front
Rear
6
Assembly Manual
1
A
1
B
46
44
44
45
46
44
44
45

Advertisement

loading

This manual is also suitable for:

Ic eliteIc elite indoor cycling bike