Mercedes-Benz ML350 Operator's Manual page 268

M-class
Hide thumbs Also See for ML350:
Table of Contents

Advertisement

Warning!
The cargo tie-down rings should be subject
to equal loads. Make sure to comply with
the information provided in the loading in-
structions ( page 259).
Turn mounting element 2 in the cargo
rail to N.
Insert cargo tie-down ring 1 into
mounting element 2.
Turn mounting element 2 until it en-
gages in the ‹ position.
You should be able to feel the mounting
element engage in the cargo rail.
Belt reel
G
1 Belt reel
2 Mounting element
3 Locking button
i
The belt reel can be used to tighten
light-weight loads against the side wall
of the cargo compartment, thus secur-
ing them from slipping.
Controls in detail
Loading
Insert two mounting elements 2 into a
cargo rail.
Turn mounting element 2 in the cargo
rail to N.
Insert belt reel 1 into mounting
element 2.
Turn mounting element 2 in the cargo
rail until it engages in the ‹ posi-
tion.
You should be able to feel the mounting
element engage in the cargo rail.
Press locking button 3 on the belt
reel 1 and pull cargo net out in direc-
tion of arrow.
Place load between the cargo net and
the side wall of the cargo compart-
ment.
Press locking button 3 on belt
reel 1. With the other hand, slowly
pull net over load until it is taut.
267

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ml500

Table of Contents