Ac Operation - Honda EM600 Owner's Manual

Hide thumbs Also See for EM600:
Table of Contents

Advertisement

AC operation
1. Start the engine and make sure the pilot
lamp comes on. If not, the fila-
ment may be burnt out.
2. Move the selector switch to the AC position.
3. Plug in the appliance.
CAUTION:
Be sure that appliances
do not exceed the rated load for more
than 30 minutes,
and never exceed the maximum
load. Substantial
over-
loading
will
switch
off the circuit
breaker.
Lesser overloading
will
not
switch
off the circuit
breaker
and will shorten
the service life of the gen-
erator.
4. Check
the frequency
meter
to verify
that the generator
is operating
at
60Hz.
If it is not, turn the throttle
knob
to increase or decrease engine
speed until
the correct
frequency
is obtained
(meter
bar next to 60 will
vibrate).
NOTE:
l
An overloaded
AC circuit
will trip the AC circuit
breaker.
If this occurs,
wait a few minutes
before pushing the circuit
breaker to resume operation.
/
FREOUENCY
METER
TilROTTLE
KNOB
9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Em500

Table of Contents