Charging Instructions; Pressure Service Ports; System Start-Up; Table 9 - Bard HAC181-AD040 Installation Instructions Manual

Split air conditioner outdoor section, for use with: matching indoor blower coil units and matching add on coil units only
Table of Contents

Advertisement

PRESSURE SERVICE PORTS

High and low pressure service ports are installed on all units
so that the system operating pressures can be observed.
Pressure tables can be found later in the manual covering all
models. It is imperative to match the correct pressure table
to the unit by model number.
SYSTEM START-UP (INDOOR UNITS
WITHOUT EXPANSION VALVES)
1. Close disconnect switch(es) and set the thermostat to
cool and the temperature to the highest setting.
2. Check for proper airflow across the indoor coil by
referring to indoor unit installation.
3. Connect the service gauges and allow the unit to run for
at least 10 minutes or until pressures are stable. Check
pressures to the system pressure table attached to the
outdoor unit service panel. For optimum system
performance, go to Step 4.
4. Install a thermometer on the suction line approximately
6" to 10" from the compressor. Optimum system
performance will occur with a refrigerant charge
resulting in a suction line superheat as determined from
the following calculations.
A. Measure outdoor air dry bulb temperature
B. Measure indoor air wet bulb temperature
C. Measure suction pressure
D. Measure suction line temperature
E. Determine optimum system superheat
from Table 9 using outdoor air dry bulb
(Step B) and indoor air wet bulb (Step A)
F. Determine saturated suction temperature
from suction pressure using Table 10 ________ ºF
G. Determine system superheat:
Suction line temperature (Step D)
- Saturated suction temperature (Step F)
= System superheat
H. Adjust the system superheat (Step G) to the
optimum system superheat (Step E) by adding
charge to lower the superheat or removing
charge to raise the superheat.
I. Check final system operating pressures to the
system pressure tables as was done in Step 3.

CHARGING INSTRUCTIONS

O
T
SATURATED SUCTION TEMPERATURE R-22
S
________ ºF
________ ºF
______ PSIG
________ ºF
________ ºF
________ ºF
- ________ ºF
= ________ ºF

TABLE 9

SYSTEM SUPERHEAT
R
e
u t
u
d t
o
r o
A
m
b
e i
t n
e
m
p
e
a r
u t
e r
(
F
D
y r
B
l u
) b
5
9
1
0
5
1
9
5
1
9
0
1
8
5
3
8
0
8
7
5
1
0

TABLE 10

u
t c
o i
n
P
e r
s
s
u
e r
P
S
G I
5
0
5
3
5
5
5
8
6
1
6
3
6
5
6
7
7
0
7
3
7
6
7
9
8
2
8
6
n r
A
r i
T
e
m
p
e
a r
u t
e r
F
W
t e
B
u
b l
6
3
6
7
7
1
1
5
3
(
) 8
2
0
7
1
4
2
6
9
1
9
3
3
1
4
2
5
3
9
2
0
3
0
4
2
S
a
u t
a r
e t
d
S
u
t c
o i
n
T
e
m
p
e
a r
u t
e r
(
) F
2
6
2
8
3
0
3
2
3
4
3
6
3
8
3
9
4
1
4
3
4
5
4
7
4
9
5
1
Manual 2100-346
Page
15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents