External Module Disassembly Process
External Modules Disassembly Flowchart
The flowchart below gives you a graphic representation on the entire disassembly sequence and instructs you
on the components that need to be removed during servicing. For example, if you want to remove the main
board, you must first remove the keyboard, then disassemble the inside assembly frame in that order.
Screw List
Step
3G Module
HDD Carrier
ODD Bracket
Chapter 3
Remove
Remove
DIMMs
3G Card
Screw
M2*3
2
M3*3
4
M2*5
2
M2*3
2
Turn off system
and peripherals
power
Disconnect power
and signal cables
from system
Remove
Battery
Remove
Dummy Cards
Remove
Lower Covers
Remove
HDD
Quantity
86.TQ702.003
86.TQ702.006
86.TQ702.005
86.TQ702.003
Remove
ODD
Part No.
49