Mainboard Installation - Acer Aspire Z1100 Service Manual

Acer aspire z1100 desktop service guide
Table of Contents

Advertisement

Mainboard Installation

NOTE:
NOTE:
Make sure all cables are clear when installing mainboard.
1. Align and install mainboard to guidepins (Q) on middle frame.
2. Install and secure screws (P) to middle frame.
3. Connect the following cables: (Figure 3-42)

Button board cable (H) to mainboard connector (h)

Fan cable (J) to mainboard connector (j)

ODD cable (K) to mainboard connector (k)

LVDS cable (M) to mainboard connector (m)

Camera cable (N) to mainboard connector (n)

Function board cable (G) to mainboard connector (g)
4. Connect the following cables:

Right light bar cable (C) to mainboard connector (c)

Speaker cable (B) to mainboard connector (b)

Infrared board cable (A) to mainboard connector (a)

Left light bar cable (D) to mainboard connector (d)

Power board cable (E) to mainboard connector (e)

Converter board cable (F) to mainboard connector (f)
5. Install CPU, Thermal Module, RTC Battery, WLAN Module, DIMM Modules and TV Tuner
Module.
3-46
(Figure
ID
Size
P
M3.0x5.0
0
3-41)
Quantity
Screw Type
2
Machine Maintenance Procedures
(Figure
3-41)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents