HP ProLiant DL360 G3 Server High-Density Deployment
Conclusion
Completing the
Installation
The load requirements of high-density server installations can be significant. Careful
planning using accurate calculations and providing overhead compensation for
peripheral devices can greatly reduce the chances for downtime due to power problems.
To complete the installation
1. Install side panels on the outsides of the end racks.
2. Install the front and rear doors.
3. Connect the PDUs to the power source.
4. Power up the servers.
: