Assembly; Install Blower Pipes; Install Stick Handle - Echo PB-46HT Operator's Manual

Echo power blower operator's manual
Hide thumbs Also See for PB-46HT:
Table of Contents

Advertisement

12
A
SSEMBLY
WARNING
Never perform maintenance or assembly procedures with engine
running or serious personal injury may result.

INSTALL BLOWER PIPES

1. Assemble clamp (A) onto both ends of flexible pipe (B).
2. Assemble straight pipe with swivel (C) into flexible pipe (B) and
tighten clamp (A).
3. Assemble flexible pipe (B) to elbow (D) on blower and tighten
clamp (A).
4. Assemble straight pipe (E) to pipe with swivel (C), turning straight
pipe clockwise to lock in place.
5. Assemble curved pipe (F) to straight pipe (E) turning curved pipe
clockwise to lock in place.

INSTALL STICK HANDLE

1. Remove blower pipe from swivel tube (C).
2. Loosen wing nut (G) completely and expand open stick handle
clamp (H).
3. Align notches (J) in handle clamp with pipe pegs (K). Handle
should be angled away from operator.
4. Slide handle onto swivel tube (C).
5. Position handle for comfortable operation and tighten wing nut
(G).
6. Install blower pipe to swivel tube.
DANGER
C
E
F

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pb-60htPb-46ln

Table of Contents