Step-By-Step Operator Mounting Instructions - Chamberlain Miracle-One Instruction Manual

Miracle one manual
Hide thumbs Also See for Miracle-One:
Table of Contents

Advertisement

P R O C E D U R E
M o u n t i n g
Step 1:
Remove the 4 screws and lift the
operator cover off.
Step 3:
Position the Miracle 1 horizontally level on the closed gate, where desired. For strength purposes, the
front steel bracket must be attached in an area that can withstand heavy forces . Additional reinforcement steel
plates may be necessary for mounting.
If using a gate crossbar, weld bar across all pickets.
the crossbar on a few pickets, or they will bend.
Step 4:
Position and level the operator brackets and reinforcement plates. (See next page) . Tack weld brackets
and plates in position.
F O R
I N S T A L L A T I O N
I n s t r u c t i o n s
Step 2:
Release the mechanical lock by turning the
key to the horizontal position.
Do not
weld
The Miracle 1 can be mounted on top
of the gate frame.
11
Important:
Tack weld the front steel
bracket at the top of the
crossbar, so the operator
will not hit the crossbar
when in motion.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Elite the miracle-one

Table of Contents