Adding A Task; Adding A Note; Adding A Shift - Canon Studio Solution User Manual

Hide thumbs Also See for Studio Solution:
Table of Contents

Advertisement

Adding a Task

To assign a task to this employee:
1. Select Add Task from the bottom of the window.
2. Choose a date, starting time, and end time for the task.
3. Enter a name for the task. You must enter a name.
4. Enter a description for the task. This is optional.
5. Update or add a status to the task. Examples: assigned, completed.
6. Assign an employee (or multiple employees) to the task. If you need to add or
edit an existing employee, read the previous section on setting up employees.
7. Select Save Task.
8. The task will now appear on the employee details page and the calendar.

Adding a Note

To add a note for this employee:
1. Select Add Notes from the bottom of the window.
2. Type a note and select Save Note.
3. You can also view and remove existing notes, listed by date and time. Select
[Remove] to delete a note.

Adding a Shift

To add a shift for this employee:
1. Select Add Schedule from the bottom of the window.
2. Choose a date, start time, and end time for the shift.
107
Using: Your Studio

Advertisement

Table of Contents
loading

Table of Contents