8.4 Power-On Sequence; Figure 8.2 Idd Operation Sequence At Power-On - Fujitsu MAN3367FC - Enterprise 36.7 GB Hard Drive Product/Maintenance Manual

Disk drives
Table of Contents

Advertisement

8.4
Power-On Sequence
Figure 8.2 shows the operation sequence of the IDD at power-on. The processes shown in this figure
are explained below:
1) After the power is turned on, the IDD executes self-diagnosis 1 (MPU bus test, internal register
write/read test, and work RAM write/read test).
2) When self-diagnosis 1 terminates successfully, the IDD activates the spindle motor when the
motor start mode is set.
3) The IDD executes self-diagnosis 2 (data buffer write/read test).
4) The IDD receives the START UNIT command, then the IDD activates the spindle motor when
the motor start mode is set. When the motor start mode is not set, the IDD terminates this
sequence and enters the command waiting state.
5) The IDD checks that the spindle motor rotation reaches a steady rotational speed.
6) The IDD executes self-configuration. This includes execution of the factory calibration which is
described on the next page and the processing of reading the format information and defect
position information written in the system zone.
7) The disk drive is in ready state and commands from the host system can be executed.
Power-on
Start
(1)
Self-diagnosis 1
• MPU bus test
• Internal register
write/read test
• Work RAM write/read
test
Motor start mode
(2)
setting
Activate spindle motor
(3)
Self-diagnosis 2
• Data buffer write/read
test
C141-E133-02EN
OFF
ON
Figure 8.2
IDD operation sequence at power-on

8.4 Power-On Sequence

Motor start mode
(4)
switch setting
ON
Check spindle motor
(5)
steady state rotation
(6)
Execute self-calibration
Drive ready state
(7)
(command waiting state)
End
OFF
8-5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Man3735fc seriesMan3367fc series

Table of Contents