Chamberlain LA500 Installation Manual page 13

Elite series vehicular swing gate operator
Hide thumbs Also See for LA500:
Table of Contents

Advertisement

Identify your installation type. The installation steps in this manual will show a typical Pull-to-Open application.
PULL-TO-OPEN
Column Install
10"
Minimum
NOTE: Weld Re Bar
Behind Gate Hinges for
Maximum Strength.
Top View
SINGLE GATE
Operator
Control Box
Water Tight Conduit
(Not provided)
Earth Ground Rod
INSTALLATION TYPES
Post Install
Gate Hinge
Gate Hinge
Heavy Steel Plate
for Reinforcement
(Not provided)
Heavy Steel
Bracket
(Reinforce if
Back Steel Plates
necessary)
for Reinforcement
(Not provided)
Back Steel
Bracket
(Reinforce if
necessary)
Gate Hinge
Gate Hinge
!
Column Install
NOTE: Weld Re Bar
Behind Gate Hinges for
Maximum Strength.
Top View
Heavy Steel Plate for
Reinforcement (Not provided)
Primary Operator
Control Box
!
Water Tight Conduit (Not provided)
Earth Ground Rod
11
SITE PREPARATION
PUSH-TO-OPEN
Post Install
Gate Hinge
Gate Hinge
Heavy Steel Plate
for Reinforcement
(Not provided)
Back Steel Bracket
(Reinforce if necessary)
Gate Hinge
Gate Hinge
DUAL GATE
Secondary Operator
Junction Box
!
Shielded low
voltage wires.