Set-Up & Delivery Guidelines - Dynasty Spas D-1000 Owner's Manual

Deluxe, premier and elite system
Table of Contents

Advertisement

S e t - u p & D e l i v e r y G u i d e l i n e s
Getting Ready For Delivery & Set-up Of Your New Spa
Surface And Pad Requirements
Your new portable spa must be placed on a uniformly firm, flat, and level
surface. A concrete pad 4 inches thick is best.
If your spa is located near sprinklers, adjust or cap them so as not to
hit the siding of the spa.
Balconies And Deck Requirements
Decking must be constructed to support 85 pounds per square foot.
Balconies must be constructed to meet current state and local codes.
Gates must be self closing and self-latching.
Access & Clearance
Your spa requires up to 40" of clearance through gates between house
and side fences, and up to 8.5' overhead clearance depending on the size
of the unit.
The clearance required to turn a corner can be equal to the length of the
spa.
All debris blocking access to the job site, must be removed prior
to delivery. Any trimming of trees or bushes, removal of debris, leveling
of ground or other general maintenance must be done prior to
delivery and is the responsibility of the customer.
Electrical Requirements
Your 110 Volt spa pack requires an isolated (no other appliances or lights
on this circuit at any time) 110 Volt, 20 amp circuit breaker cords maximum
length 15 ft.
Your 220 Volt spa pack will require a 50 amp dedicated GFCI circuit
breaker, depending on model.
Wiring Requirements
4 Wire #8 Gauge wire under 50 ft.
2-Hots, 1-Neutral, 1-Isolated
Ground
4 Wire #6 Gauge wire over 50 ft.
2-Hots, 1-Neutral, 1-Isolated
Ground
8

Advertisement

Table of Contents
loading

This manual is also suitable for:

D-2000D-3000

Table of Contents