Installation Checklist - Chamberlain CSW200UL Owner's Manual

Vehicular swing gate operator
Hide thumbs Also See for CSW200UL:
Table of Contents

Advertisement

Installation Checklist

1. Owner and installer must read all warnings and safety precautions.
2. Make sure concrete mounting pad is big enough and deep enough for operator.
3. Operator must be securely fastened to concrete pad or mounting plate.
4. Operator arm must be level and welded properly to gate.
5. Rectangular tubes on operator arm must be completely welded around.
6. When gate is pulled, No slippage of operator arm should occur.
7. Gate operator to be grounded to an earth ground rod within 3 feet of operator.
8. Verify that AC power is connected properly and Property Owner knows how to shut off power to operator.
9. Verify that the gate opens and closes as needed.
10. When gate hits object during operation, it must stop or reverse direction.
11. Know how to operate the emergency manual release.
12. Make sure that any pinch point or potential entrapment are guarded by means of safety devices or like.
13. Warning placards need to be permanently mounted on both sides of gate.
14. Test all additional equipment connected to operator.
15. Make sure all wire connections are securely fastened.
16. Review typical maintenance on operator.
17. Schedule periodic maintenance on operator by qualified service technician.
18. inquire about Manufacturers "operator warranty." (Warranty Card included with operator.)
19. inquire about separate "installation warranty" with installer.
Installer Company Name, Address and Phone Number
Date Installed:
51

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents