VMware VCM 5.3 - RECOVERY GUIDE Manual page 11

Configuration manager backup and disaster recovery guide
Table of Contents

Advertisement

Performing Backup Procedures
6. Click Change to create a schedule for the Full Backup Plan.
7. Ensure that the schedule is enabled as a Recurring schedule type.
8. Configure the schedule at a time when minimal Collector activity will be occurring.
9. Click Next. The Select Maintenance Tasks page appears.
VMware, Inc.
11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vcm 5.3

Table of Contents