Post Execution Commands - HP BB118BV - StorageWorks Data Protector Express Package Addendum

Hp storageworks data protector express 3.5 sp2, software addendum (bb116-90018, october 2007)
Hide thumbs Also See for BB118BV - StorageWorks Data Protector Express Package:
Table of Contents

Advertisement

Post Execution Commands

Post Execution Commands
The post execution job property controls what shell commands should be executed after
the job completes with no error, or with error.
Stop job if command fails to be executed: When checked, stops the job if the
command fails to be executed, such as if the command does not exist, or the
operating system cannot property determine how to execute the command.
Run command on all hosts selected in job, as well as the Data Protector
Express Backup Server: When checked, processes the command on all
machines selected in job. When unchecked, only runs the command on the Data
Protector Express Backup Server.
Number of minutes to wait for command completion: This value in minutes
specifies how long the application should wait for the command to return. By
default, it is set to Forever, meaning the application will wait for as long as
possible for the command to complete. If set to something other then Forever,
the application will terminate the command forcefully if it does not return in
time.
Stop job if command returns error code: When checked, causes the job to be
stopped if the pre command is successfully executed, but returns a non zero code.
When checked, enables the range options beneath it.
Do not stop job if the following error code range is returned: When checked,
an error code range to be specified which are treated as warnings. If the return
code is not in the specified range, it will cause the job to be stopped.
41

Advertisement

Table of Contents
loading

This manual is also suitable for:

Storageworks data protector express

Table of Contents