Power Module Bay

The power module bay provides an easy way to replace a failed power module APS300W. If
the switch needs to continue to operate while you replace the power supply, another
APS300W must be used installed in the second power supply bay on the switch rear panel.

Installing a Power Module

To install a power module, follow these steps:
WARNING!
When inserting a power module into the switch, do not use
unnessary force. Doing so can damage the connectors on the rear
of the supply and on the midplane
1.
Insert the new power supply module into the power module slot, and gently push the
module into the slot.
Figure 5. Insert the Power Supply Module
2.
Align the two captive screws with the screw holes in the switch's rear panel.
3.
Using a screwdriver, gently tighten the captive screws.
4.
Connect the power cord to the module and to an AC-powered outlet.

Removing a Power Module

To remove a power module, follow these steps:
1.
Disconnect the power cord from the power module.
2.
Remove the power cord from the power connector.
3.
Loosen the two captive screws on the power module.
4.
Remove the power module from the power module slot by pulling on the extraction handle.