Novell ZENWORKS PATCH MANAGEMENT 6.4 SP2 User Manual page 118

Hide thumbs Also See for ZENWORKS PATCH MANAGEMENT 6.4 SP2:
Table of Contents

Advertisement

W
W
D
ORKING
ITH
EPLOYMENTS
Icon
:
NOTE
is chained, ZENworks Patch Management Server determines the deployment order. However, when no
longer chained, the package can be deployed at anytime following the chained deployments.
The Selected Options icons are used to identify package deployment actions.
Action
Selected Options
Reboot
Move to top
Move up one line
Move down one line
Move to bottom
Restore defaults
Chained packages cannot be moved without first removing their chained status. When a package
View the behavior of each package. For
additional information refer to Behavior Icon
Definitions on page 103..
View the reboot settings of each package. For
additional information refer to Reboot Icon
Definitions on page 105..
Move the package to the top of all non-chained
deployments (this will place it immediately after
the chained deployments).
Move the package up one.
Move the package down one.
Move the package to the bottom of the listing.
Restore the package order and behavior back to
their default settings.
- 102 -
Use To

Advertisement

Table of Contents
loading

Table of Contents