Novell ZENWORKS PATCH MANAGEMENT 6.4 SP2 User Manual page 115

Hide thumbs Also See for ZENWORKS PATCH MANAGEMENT 6.4 SP2:
Table of Contents

Advertisement

2.
In the Occurs field, select Monthly.
S
R
:
The Deployment Wizard displays the Monthly Deployment Options
TEP
ESULT
fields.
Figure 4-20: Monthly Options
3.
Select the frequency of the deployment:
Day X of every X month(s) - allows the deployment to be scheduled on a specific
date every X months. Valid date options are 1 through 31, with the ability to choose
1 through 99 months.
The Xth Weekday of every X month(s) - allows the deployment to be run on a
specific day every X months. The valid day options are: 1st, 2nd, 3rd, 4th, or Last,
weekday options are: Sunday through Saturday, Day, Week day, or Weekend day
and monthly recurrence options are: 1 through 99 months
Figure 4-21: Common Deployment Options
4.
Continue to Selecting the Deployment Start and End Functions.
- 99 -
W
W
D
ORKING
ITH
EPLOYMENTS

Advertisement

Table of Contents
loading

Table of Contents