Nylon Line Installation; Front (Loop) Handle - Echo GT-200R - SERIAL NUMBER 07003101-07999999 Operator's Manual

Table of Contents

Advertisement

12

NYLON LINE INSTALLATION

1. Shut engine off. Lay unit on the ground with head assembly up.
2. Remove old nylon line through center recess of head.
3. Thread new lines through outside holes (A) in housing until ends
meet in center of recess.
NOTE
Insert cutting line ends to center of head recess to insure easy
removal of used lines.
(
FRONT
LOOP
NOTE
Front handle is pre-installed. Re-positioning and tightening is all
that is required.
1. Position front handle (A) in comfortable operating position and
tighten wing nut (B). The cutting attachment should be 5-7.5 cm
(2-3 in.) above the ground and as level as possible.
)
HANDLE
A
A
B

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gt-200r

Table of Contents