Desa SDVBND Owner's Operation And Installation Manual page 22

Cast iron stove and direct-vent (freestanding fireplace heater) burner system for civfc/pscivfc/vcis/pvcis/vh series stoves
Table of Contents

Advertisement

STOVE AND DIRECT-VENT BURNER SYSTEM INSTALLATION
22
Checking Gas Connection (Cont.)
Installing Optional Wall Mount Switch - GWMS2
STOVE AND DIRECT-VENT
BURNER SYSTEM
INSTALLATION
Continued
3.
Check all joints from propane/LP supply tank or gas meter to
equipment shutoff valve (see Figure 43 for propane/LP or Figure
44 for natural). Apply noncorrosive leak test solution to all gas
joints. Bubbles forming show a leak. Correct all leaks at once.
Pressure Testing Burner System Gas Connections
1.
Open equipment shutoff valve (see Figure 42, page 21).
2.
Open propane/LP supply tank valve for propane/LP burner
system or main gas valve located on or near gas meter for natu-
ral gas burner system.
3.
Make sure control knob of burner system is in the OFF position.
4.
Check all joints from equipment shutoff valve to thermostat
gas valve (see Figure 43 for propane/LP or Figure 44 for natu-
ral). Apply noncorrosive leak detection solution to all gas joints.
Bubbles forming show a leak. Correct all leaks at once.
5.
Light burner system (see Operating Stove with Burner System,
page 26). Check all other internal joints for leaks.
6. Turn off burner system (see To Turn Off Gas to Appliance,
page 26).
Gas Valve
Figure 43 - Checking Gas Joints for Propane/LP Gas Burner
System (Oxford™ Model Shown)
For more information, visit www.desatech.com
For more information, visit www.desatech.com
Equipment
Shutoff
Propane/LP
Valve
Supply Tank
Gas Valve
Figure 44 - Checking Gas Joints for Natural Gas Burner System
(Oxford™ Model Shown)
INSTALLING OPTIONAL WALL MOUNT
SWITCH - GWMS2
1.
Connect one terminal of 25 ft. wire for the wall switch to the
TPTH terminal on the valve. Connect remaining wire terminal
to the TH terminal on the valve. Make sure that the wire termi-
nals are in the positions on the unit as pictured in Figure 45. If
wires are not connected as shown the switch will not work.
2. Route the 25 ft. wire through openings provided on the sides of
the burner system to a convenient location to mount your switch.
3. Connect one bare wire end to each of the terminals of the
GWMS2 wall switch.
4. Install the wall switch and cover in the wall.
Figure 45 - Control Valve Terminals
Equipment
Shutoff
Valve
Gas Meter
To Control
Switch or
Optional
Accessory
112126-01B

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sdvbpd

Table of Contents