Desa CDCFNR Owner's Operation And Installation Manual page 16

Unvented (vent-free) gas compact classic hearth dual burner fireplace
Table of Contents

Advertisement

INSTALLATION
Continued
16
Installation must include an equipment shutoff
valve, union, and plugged 1/8" NPT tap. Locate
NPT tap within reach for test gauge hook up. NPT
tap must be upstream from heater (see Figure 21).
IMPORTANT: Install equipment shutoff valve
in an accessible location. The equipment shutoff
valve is for turning on or shutting off the gas to
the appliance.
Check your building codes for any special re-
quirements for locating equipment shutoff valve
to fireplaces.
Apply pipe joint sealant lightly to male NPT
threads. This will prevent excess sealant from
going into pipe. Excess sealant in pipe could result
in clogged fireplace valves.
sealant that is resistant to liquid
petroleum (LP) gas.
Approved
Flexible
Gas Line
* Purchase the optional CSA design-certified
equipment shutoff valve from your dealer. See
Accessories, page 44.
www.desatech.com
WARNING: Use pipe joint
CSA Design-Certified
Equipment Shutoff Valve
With 1/8" NPT Tap*
3" Minimum
Pipe Nipple Cap Tee Joint
Figure 21 - Gas Connection
111244-01D

Advertisement

Table of Contents
loading

Table of Contents