Pending Operations - ACRONIS BACKUP AND RECOVERY 10 ADVANCED SERVER - UPDATE 3 User Manual

Hide thumbs Also See for BACKUP AND RECOVERY 10 ADVANCED SERVER - UPDATE 3:
Table of Contents

Advertisement

to save additional space which is being lost due to the cluster size on the FAT16 or FAT32 file
systems
as a quick and more or less reliable way of destroying data, residing in this volume
If you want to format a volume:
1. Select a volume to format.
2. Right-click on the selected volume, and then click Format in the context menu.
You will be forwarded to the Format Volume window, where you will be able to set the new file
system options. You can choose one of the Windows file systems: FAT16 (disabled, if the Volume
Size is more than 2 GB), FAT32 (disabled, if the Volume Size is more than 2 TB) or NTFS.
In the text window you will be able to enter the volume label, if necessary: by default this
window is empty.
In setting the cluster size you can choose between any number in the preset amount for
each file system. Note, the program suggests the cluster size best suited to the volume with
the chosen file system.
3. If you click OK to proceed with the Format Volume operation, you'll add a pending operation of
formatting a volume.
(To finish the added operation you will have to commit (p. 293) it. Exiting the program without
committing the pending operations will effectively cancel them.)
The new volume structure will be graphically represented in the Disk management view.
If you set a 64K cluster size for FAT16/FAT32 or an 8KB-64KB cluster size for NTFS, Windows can mount the
volume, but some programs (e.g. Setup programs) might calculate its disk space incorrectly.

6.11.7 Pending operations

All operations, which were prepared by the user in manual mode or with the aid of a wizard, are
considered pending until the user issues the specific command for the changes to be made
permanent. Until then, Acronis Disk Director Lite will only demonstrate the new volume structure
that will result from the operations that have been planned to be performed on disks and volumes.
This approach enables you to control all planned operations, double-check the intended changes,
and, if necessary, cancel operations before they are executed.
To prevent you from performing any unintentional change on your disk, the program will first display
the list of all pending operations.
The Disk management view contains the toolbar with icons to launch the Undo, Redo and Commit
actions intended for pending operations. These actions might also be launched from the Disk
management menu of the console.
All planned operations are added to the pending operation list.
The Undo action lets you undo the latest operation in the list. While the list is not empty, this action
is available.
The Redo action lets you reinstate the last pending operation that was undone.
The Commit action forwards you to the Pending Operations window, where you will be able to view
the pending operation list. Clicking Proceed will launch their execution. You will not be able to undo
any actions or operations after you choose the Proceed operation. You can also cancel the
commitment by clicking Cancel. Then no changes will be done to the pending operation list.
293
Copyright © Acronis, Inc., 2000-2010

Advertisement

Table of Contents
loading

This manual is also suitable for:

Backup & recovery 10 advanced server

Table of Contents