Connecting To Gas Supply - Desa Glo-Warm FA-3B Owner's Operation And Installation Manual

Desa owner's operation and installation manual infrared vent-free natural gas heater fa-3b, fas-3c, fa-5b, fas-5c
Table of Contents

Advertisement

INFRARED NATURAL GAS HEATER
INSTALLATION
Continued
CONNECTING TO GAS
SUPPLY
WARNING: This appliance re-
quires a 3/8" NPT (National Pipe
Thread) inlet connection to the
pressure regulator.
WARNING: A qualified service
person must connect heater to
gas supply. Follow all local codes.
WARNING: Never connect
heater to private (non-utility) gas
wells. This gas is commonly
known as wellhead gas.
IMPORTANT: Check gas line pressure be-
fore connecting heater to gas line. Gas line
pressure must be no greater than 14 inches
of water. If gas line pressure is higher,
heater regulator damage could occur.
CAUTION: Use only new,
black iron or steel pipe. Inter-
nally-tinned copper tubing may
be used in certain areas. Check
your local codes. Use pipe of large
enough diameter to allow proper
gas volume to heater. If pipe is
too small, undue loss of pres-
sure will occur.
Typical Inlet Pipe Diameters
FA-3B/FAS-3C
3/8" or greater
FA-5B/FAS-5C
1/2" or greater
Installation must include equipment shutoff
valve, union, and plugged 1/8" NPT tap.
Locate NPT tap within reach for test gauge
hook up. NPT tap must be upstream from
heater (see Figure 14).
IMPORTANT: Install an equipment shutoff
valve in an accessible location. The equip-
ment shutoff valve is for turning on or
shutting off the gas to the appliance.
Apply pipe joint sealant lightly to male
threads. This will prevent excess sealant
from going into pipe. Excess sealant in pipe
could result in clogged heater valves.
CAUTION: Use pipe joint seal-
ant that is resistant to liquid pe-
troleum (LP) gas.
Pressure
Regulator
Regulator
Bracket
Heater
Cabinet
Tee Joint
Reducer
Test
Bushing to
Gauge
1/8" NPT
Connection *
1/8" NPT
Plug Tap
Tee Joint
Sediment
Pipe Nipple
Trap
Cap
Figure 14 - Gas Connection
* A CSA/AGA design-certified equipment shutoff valve with 1/8" NPT tap is an acceptable
alternative to test gauge connection. Purchase the optional CSA/AGA design-certified
equipment shutoff valve from your dealer. See Accessories, page 19.
10
Install sediment trap in supply line as shown
in Figure 14. Locate sediment trap where it
is within reach for cleaning. Locate sedi-
ment trap where trapped matter is not likely
to freeze. A sediment trap traps moisture
and contaminants. This keeps them from
going into heater controls. If sediment trap
is not installed or is installed wrong, heater
may not run properly.
IMPORTANT: Hold pressure regulator
with wrench when connecting it to gas pip-
ing and/or fittings.
3/8" NPT
Pipe Nipple
Ground Joint
Union
Inlet Pipe From Gas
Meter (7" W.C. to
10.5" W.C. Pressure)
3" Minimum
Equipment
Shutoff
Valve *
105566

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Glo-warm fa-5bGlo-warm fas-3cGlo-warm fas-5c

Table of Contents