Locating Materials - Compaq 234664-002 - ProLiant - ML330T02 Setup And Installation Manual

Compaq proliant ml330 generation 2 server setup and installation guide
Hide thumbs Also See for 234664-002 - ProLiant - ML330T02:
Table of Contents

Advertisement

Compaq 9000 Series racks provide proper server cooling from flow-through
perforations, ensuring 64 percent open area for ventilation. Refer to the rack
documentation provided with Compaq 7000 Series racks for guidelines on
meeting airflow requirements.
For additional information and instructions on installing your server into a
rack, refer to your rack enabling kit documentation.

Locating Materials

Locate the following materials that were shipped with your ProLiant ML330
Generation 2 server:
I
Keyboard
I
Mouse
I
Power cord
I
Documentation and software packs inside the shipping box
In addition to these supplied items, you may need:
I
Torx T-15 screwdriver
I
Phillips #2 screwdriver
I
Hardware options
I
Uninterruptible power supply (UPS)
I
Ethernet cable
I
Monitor
I
Application software
CAUTION: If a third-party rack is used, observe the following additional
requirements to ensure adequate airflow and to prevent damage to the
equipment:
I
Front and rear doors: if your 42U server rack includes closing front and
rear doors, you must allow 5,350 sq cm (830 square inches) of holes
evenly distributed from top to bottom to permit adequate airflow
(equivalent to the required 64 percent open area for ventilation).
I
Side: The clearance between the installed rack component and the side
panels of the rack must be a minimum of 7 cm (2.75 inches).
Overview of Server Installation 2-5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Proliant ml330 generation 2

Table of Contents