SMC Networks BR21VPN - annexe 1 Manual page 8

Dual wan port load balancing vpn router
Table of Contents

Advertisement

Please read the following safety information carefully
before installing the device:
WARNING: Installation and removal of the unit must be carried out by
qualified personnel only.
This guide is intended for use by network administrators who are
responsible for setting up and installing network equipment;
consequently it assumes a basic working knowledge of LANs (Local Area
Networks).
The unit must be connected to an earthed (grounded) outlet to comply with
international safety standards.
Do not connect the unit to an A.C. outlet (power supply) without an
earth (ground) connection.
The appliance coupler (the connector to the unit and not the wall plug)
must have a configuration for mating with an EN 60320/IEC 320
appliance inlet.
The socket outlet must be near to the unit and easily accessible. You can only
remove power from the unit by disconnecting the power cord from the outlet.
This unit operates under SELV (Safety Extra Low Voltage) conditions
according to IEC 60950. The conditions are only maintained if the
equipment to which it is connected also operates under SELV
conditions.
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Barricade smcbr21vpn

Table of Contents