Installing The Mcu Mse 8510; Step One: Install The Mcu Mse 8510 Into The Mse 8000 Chassis - Cisco C8510MSR-SKIT-DC - Catalyst 8510 Multiservice Switch Router Getting Started

Getting started
Table of Contents

Advertisement

Installing the MCU MSE 8510

Important
read the safety information guide for the MSE 8000 chassis at
http://www.cisco.com/go/telepresence/safety.
Although blades are hot-swappable parts, you must only remove one
!
blade at any time. Remove the power from the MSE 8000, if you need to
remove more than one blade at a time.
Before hot-swapping a blade, shut down the blade using the web interface.
!
Do not shut down a blade during a software upgrade or if the blade is
processing (for example if a conference is taking place on a blade).
The MSE 8000 backplane uses high performance data connectors. Do not
!
remove MCU MSE 8510 blades unless necessary because doing so may
reduce the life of these connectors.
Make sure that you have the correct power requirements and sufficient
!
power in your PSU; for information on powering the MSE 8000 refer to
the Getting Started Guide on
conferencing-documentation.jsp).

Step one: Install the MCU MSE 8510 into the MSE 8000 chassis

You must install either a blade or a blanking blade in each of the ten
!
positions in the chassis.
The Supervisor blade must be installed into slot 1 of the MSE 8000
!
chassis.
1
Remove the blade or blanking blade from the slot into which you are going to
install the MCU MSE 8510:
i
Using a No.1 Phillips screwdriver, loosen the screws in the retaining latches
with an anti-clockwise quarter turn.
ii
Open both retaining latches on the front of the blade or blanking blade.
When open, a retaining latch is at a 90
the blade.
: Before installing the MCU MSE 8510 into the MSE 8000,
http://www.tandberg.com/support/video-
Installing the MCU MSE 8510
angle perpendicular to the front of
°
5