UNPACKING AND INSTALLATION

This chapter provides unpacking and installation information for the
Switch.

Unpacking

Open the shipping cartons of the Switch and carefully unpacks its
contents. The carton should contain the following items:
TPE-S88
Multi-Language Quick Installation Guide
Utility CD-ROM
Power Supply
Rack Mount Kit
If any item is found missing or damaged, please contact your local
reseller for replacement.

Installation

The site where you install the hub stack may greatly affect its
performance. When installing, consider the following pointers:
Install the Switch in a fairly cool and dry place. See Technical
Specifications for the acceptable temperature and humidity operating
ranges.
Install the Switch in a site free from strong electromagnetic field
generators (such as motors), vibration, dust, and direct exposure to
sunlight.
Leave at least 10cm of space at the front and rear of the hub for
7
ventilation.
Install the Switch on a sturdy, level surface that can support its weight,
or in an EIA standard-size equipment rack. For information on rack
installation, see the next section, Rack Mounting.
When installing the Switch on a level surface, attach the rubber feet to
the bottom of each device. The rubber feet cushion the hub and
protect the hub case from scratching.

Rack Mounting

The switch can be mounted in an EIA standard-size, 19-inch rack,
which can be placed in a wiring closet with other equipment. Attach
the mounting brackets at the switch's front panel (one on each side),
and secure them with the provided screws.
Figure 1. Combine the Switch with the provided screws
Then, use screws provided with the equipment rack to mount each
switch in the rack.
Figure 2. Mount the Switch in the rack