Chapter 2 Chassis Set Up; Overview; Unpacking The Stortrends 3200; Preparing For Setup - American Megatrends StorTrends 3200 User Manual

American megatrends stortrends 3200: user guide
Hide thumbs Also See for StorTrends 3200:
Table of Contents

Advertisement

Chapter 2

Overview

This chapter provides a quick setup checklist to get your StorTrends 3200 up and running.
Following the steps in the order given should enable you to have the system operational
within a minimal amount of time. This quick setup assumes that your 3200 system has
come to you with the processor and memory preinstalled. These instructions also assume
that you are an experienced technician, familiar with common concepts and terminology.

Unpacking the StorTrends 3200

You should inspect the box the StorTrends 3200 was shipped in and note if it was
damaged in any way. If the server itself shows damage, you should file a damage claim
with the carrier who delivered it.
Decide on a suitable location for the rack unit that will hold the StorTrends 3200. It
should be situated in a clean, dust-free area that is well ventilated. Avoid areas where
heat, electrical noise and electromagnetic fields are generated.
You will also need it placed near at least two grounded power outlets. The StorTrends
3200 includes two redundant power supplies which require two grounded outlets.

Preparing for Setup

The StorTrends 3200 includes a set of rail assemblies, including mounting brackets and
mounting screws you will need to install the systems into the rack. Please read this
document in its entirety before you begin the installation procedure.
Chassis Set Up
Chapter Two : Chassis Set Up
5

Advertisement

Table of Contents
loading

Table of Contents