Summary of Contents for Lincoln Electric POWER WAVE C300
Page 1
POWER WAVE C300 ® For use with machines having Code Numbers: 11479, 11624, 11672, 11958, 12392 SERVICE MANUAL Need Help? Call 1.888.935.3877 to talk to a Service Representative Hours of Operation: 8:00 AM to 6:00 PM (ET) Mon. thru Fri. After hours? Use “Ask the Experts”...
Page 2
Miami, Florida 33135 or CSA Standard W117.2-1974. A Free copy of “Arc Welding Safety” booklet E205 is available from the Lincoln Electric Company, 22801 St. Clair Avenue, Cleveland, Ohio 44117-1199. BE SURE THAT ALL INSTALLATION, OPERATION, MAINTENANCE AND REPAIR PROCEDURES ARE PERFORMED ONLY BY QUALIFIED INDIVIDUALS.
Page 3
SAFETY ELECTRIC SHOCK can kill. ARC RAYS can burn. 3.a. The electrode and work (or ground) circuits 4.a. Use a shield with the proper filter and cover are electrically “hot” when the welder is on. plates to protect your eyes from sparks and Do not touch these “hot”...
Page 4
SAFETY WELDING and CUTTING CYLINDER may explode SPARKS can cause fire or if damaged. 7.a. Use only compressed cylinders explosion. containing the correct shielding gas for the 6.a. Remove fire hazards from the welding area.If process used and properly operating this is not possible, cover them to prevent the welding sparks regulators designed for the gas and from starting a fire.
Page 5
SAFETY 6. Eloigner les matériaux inflammables ou les recouvrir afin de PRÉCAUTIONS DE SÛRETÉ prévenir tout risque dʼincendie dû aux étincelles. Pour votre propre protection lire et observer toutes les instructions 7. Quand on ne soude pas, poser la pince à une endroit isolé de et les précautions de sûreté...
Page 6
2004/108/EC. It was manufactured in conformity with a national standard that implements a harmonized standard: EN 60974-10 Electromagnetic Compatibility (EMC) Product Standard for Arc Welding Equipment. It is for use with other Lincoln Electric equipment. It is designed for industrial and professional use. Introduction All electrical equipment generates small amounts of electromagnetic emission.
Page 7
SAFETY Electromagnetic Compatibility (EMC) The size of the surrounding area to be considered will depend on the structure of the building and other activities that are taking place. The surrounding area may extend beyond the boundaries of the premises. Methods of Reducing Emissions Mains Supply Welding equipment should be connected to the mains supply according to the manufacturer’s recommen- dations.
Page 9
- MASTER TABLE OF CONTENTS FOR ALL SECTIONS - Page Safety ................i-vi Theory of Operation .
Page 10
FIGURE E.1 BLOCK LOGIC DIAGRAM SWITCH BOARD POWER WAVE C300 BLOCK DIAGRAM ( ( S S E E C C O O N N D D S S T T A A G G E E ) ) H H I I G G H H F FR R E E Q Q U U E E N N C C Y Y I IN N V V E E R R T T E E R R W W IT ITH H...
Page 11
FIGURE E.2 - GENERAL DESCRIPTION SWITCH BOARD POWER WAVE C300 BLOCK DIAGRAM ( ( S S E E C C O O N N D D S S T T A A G G E E ) ) H H I I G G H H F FR R E E Q Q U U E E N N C C Y Y I IN N V V E E R R T T E E R R W W IT ITH H...
Page 12
FIGURE E.3 - MAIN INPUT SWITCH, INPUT RECTIFIER, SOFT START/INPUT RELAY, ETC. SWITCH BOARD POWER WAVE C300 BLOCK DIAGRAM ( ( S S E E C C O O N N D D S S T T A A G G E E ) )
Page 13
FIGURE E.4 - PLANAR TRANSFORMER, OUTPUT RECTIFICATION AND FILTERING SWITCH BOARD POWER WAVE C300 BLOCK DIAGRAM ( ( S S E E C C O O N N D D S S T T A A G G E E ) )
FIGURE E.5 - CHOPPER, CURRENT TRANSDUCER AND CONTROL BOARDS SWITCH BOARD POWER WAVE C300 BLOCK DIAGRAM ( ( S S E E C C O O N N D D S S T T A A G G E E ) )
FIGURE E.6 - FEEDHEAD BOARD & USER INTERFACE BOARD SWITCH BOARD POWER WAVE C300 BLOCK DIAGRAM ( ( S S E E C C O O N N D D S S T T A A G G E E ) )
Page 16
THEORY OF OPERATION Machine Protection THERMAL PROTECTION Three normally closed (NC) thermostats protect the machine from excessive operating temperatures. Two ther- mostats are wired in series and connected to the control board. One of the thermostats is located in the output choke assembly and the other is located on top of the secondary heat sink.
Page 17
THEORY OF OPERATION FIGURE E.7 - IGBT OPERATION MINIMUM OUTPUT 16.6 MAXIMUM OUTPUT 16.6 PULSE WIDTH MODULATION MAXIMUM OUTPUT By holding the gate signals on for 7.3 microseconds The term PULSE WIDTH MODULATION (PWM) is each and allowing only 2 microseconds of dwell or off used to describe how much time is devoted to conduc- time (one microsecond during each half cycle) during tion in the positive and negative portions of the cycle.
Page 18
THEORY OF OPERATION FIGURE E.8 - IGBT OPERATION POSITIVE VOLTAGE APPLIED GATE GATE SOURCE SOURCE BODY REGION BODY REGION DRAIN DRIFT REGION DRAIN DRIFT REGION BUFFER LAYER BUFFER LAYER INJECTING LAYER INJECTING LAYER DRAIN DRAIN A. PASSIVE B. ACTIVE INSULATED GATE BIPOLAR TRANSISTOR (IGBT) OPERATION An IGBT is a type of transistor.
HOW TO USE TROUBLESHOOTING GUIDE WARNING Service and Repair should only be performed by Lincoln Electric Factory Trained Personnel. Unauthorized repairs performed on this equipment may result in danger to the technician and machine operator and will invalidate your factory warranty. For your safety and to avoid Electrical Shock, please observe all safety notes and precautions detailed throughout this manual.
Do not touch electrically hot parts. - If you return a PC board to The Lincoln Electric Company for credit, it must be in the static-shielding bag. This will prevent further damage and allow prop- CAUTION er failure analysis.
Page 23
Board Test. CAUTION If for any reason you do not understand the test procedures or are unable to perform the tests/repairs safely, contact the Lincoln Electric Service Department for technical troubleshooting assistance before you proceed. Call 1-888-935-3877. POWER WAVE® C300...
CAUTION If for any reason you do not understand the test procedures or are unable to perform the tests/repairs safely, contact the Lincoln Electric Service Department for technical troubleshooting assistance before you proceed. Call 1-888-935-3877. POWER WAVE® C300...
Page 25
Check Set-Up menu ”P.8” CAUTION If for any reason you do not understand the test procedures or are unable to perform the tests/repairs safely, contact the Lincoln Electric Service Department for technical troubleshooting assistance before you proceed. Call 1-888-935-3877. POWER WAVE® C300...
Page 26
CAUTION If for any reason you do not understand the test procedures or are unable to perform the tests/repairs safely, contact the Lincoln Electric Service Department for technical troubleshooting assistance before you proceed. Call 1-888-935-3877. POWER WAVE® C300...
Page 27
CAUTION If for any reason you do not understand the test procedures or are unable to perform the tests/repairs safely, contact the Lincoln Electric Service Department for technical troubleshooting assistance before you proceed. Call 1-888-935-3877. POWER WAVE® C300...
Page 28
Test. used. CAUTION If for any reason you do not understand the test procedures or are unable to perform the tests/repairs safely, contact the Lincoln Electric Service Department for technical troubleshooting assistance before you proceed. Call 1-888-935-3877. POWER WAVE® C300...
Page 29
CAUTION If for any reason you do not understand the test procedures or are unable to perform the tests/repairs safely, contact the Lincoln Electric Service Department for technical troubleshooting assistance before you proceed. Call 1-888-935-3877. POWER WAVE® C300...
Page 30
TROUBLESHOOTING AND REPAIR F-11 F-11 USING THE STATUS LED TO There is an audible beeper associated with this input control TROUBLESHOOT SYSTEM PROBLEMS board’s status light. So the error codes on the input board can be detected through either the status light or the status beeper.
Page 31
TROUBLESHOOTING AND REPAIR F-12 F-12 Observe all Safety Guidelines detailed throughout this manual ERROR CODES FOR THE POWER WAVE® C300 Main control boarD ( “status” light) Error Code # Indication Thermal error Indicates over temperature. Usually accompanied by Thermal LED. Check fan operation.
Page 32
TROUBLESHOOTING AND REPAIR F-13 F-13 Observe all Safety Guidelines detailed throughout this manual input control boarD Error Code # Indication Peak input current limit Input current limit has been exceeded. Typically indicates short term power overload. If problem persists contact Service Department. Under-voltage lockout +15 VDC supply on Input control board too low.
Page 34
DISCHARGE PROCEDURE WARNING Service and repair should be performed only by Lincoln Electric factory trained personnel. Unauthorized repairs performed on this equipment may result in danger to the technician or machine operator and will invalidate your factory warranty. For your safety and to avoid electrical shock, please observe all safety notes and precautions detailed throughout this manual.
Page 35
TROUBLESHOOTING AND REPAIR F-16 F-16 CASE COVER REMOVAL AND DC LINK CAPACITOR DISCHARGE PROCEDURE (continued) FIGURE F.1 – CASE COVER SCREW LOCATION PROCEDURE 5. Recheck the voltage across the capacitor ter- minals. The voltage should be zero. If any volt- 1.
Page 36
TROUBLESHOOTING AND REPAIR F-17 F-17 CASE COVER REMOVAL AND DC LINK CAPACITOR DISCHARGE PROCEDURE (continued) FIGURE F.2 – CAPACITOR LOCATION CHOPPER CONTROL BOARD PLANAR TRANSFORMER DC LINK CAPACITOR CURRENT TRANSDUCER INPUT CHOKE CAPACITOR DISCHARGE PROCEDURE DO NOT TOUCH THE CAPACITOR TERMINALS WITH YOUR BARE HANDS.
TROUBLESHOOTING AND REPAIR F-18 F-18 CASE COVER REMOVAL AND DC LINK CAPACITOR DISCHARGE PROCEDURE (continued) FIGURE F.3 – CAPACITOR TERMINALS AND ASSOCIATED LEADS CAPACITOR TERMINALS DC LINK CAPACITOR POWER WAVE® C300...
Page 38
CONTROL BOARD TEST PROCEDURE WARNING Service and repair should be performed only by Lincoln Electric factory trained personnel. Unauthorized repairs performed on this equipment may result in danger to the technician or machine operator and will invalidate your factory warranty. For your safety and to avoid electrical shock, please observe all safety notes and precautions detailed throughout this manual.
TROUBLESHOOTING AND REPAIR F-20 F-20 CONTROL BOARD TEST PROCEDURE (continued) PROCEDURE 6. If further testing is required proceed to Step #7. 1. Disconnect the input power to the POWER WAVE® C300 machine. 7. Using the Voltmeter carefully check the volt- ages per Table F2.
Page 40
TROUBLESHOOTING AND REPAIR F-21 F-21 CONTROL BOARD TEST PROCEDURE (continued) TABLE F.3 - CONTROL BOARD ASSOCIATED RESISTANCE Conditions Description Test Points Lead Numbers Expected Readings Connection to J9 pin 3 Lead 202 Zero Ohms No Input power Output applied to Terminals Negative Negative...
Page 41
TROUBLESHOOTING AND REPAIR F-22 F-22 CONTROL BOARD TEST PROCEDURE (continued) FIGURE F.4 – LED LOCATIONS G 4 8 0 0 C O N T R O L P .C . B O A R D L E D # C O L O R F U N C T IO N G R E E N S T A T U S "...
Page 42
TROUBLESHOOTING AND REPAIR F-23 F-23 CONTROL BOARD TEST PROCEDURE (continued) FIGURE F.5 – TEST POINT LOCATIONS Switch J12 - Chopper Control Board Communication Bank 2 CAN Communication - J11 J5 - Secondary Thermostat Connection Switch Bank 1 J6 - Primary Error Communications +48 Volt DC Connection - J4 J7 - Inverter Shutdown Command Fan Control...
Page 43
TROUBLESHOOTING AND REPAIR F-24 F-24 CONTROL BOARD TEST PROCEDURE (continued) FIGURE F.6 – PLUGS & LEAD LOCATIONS PLUG J4 PLUG J5 PLUG J6 PLUG J7 PLUG J9 PLUG J8 PLUG J12 POWER WAVE® C300...
Page 44
SWITCH BOARD TEST PROCEDURE WARNING Service and repair should be performed only by Lincoln Electric factory trained personnel. Unauthorized repairs performed on this equipment may result in danger to the technician or machine operator and will invalidate your factory warranty. For your safety and to avoid electrical shock, please observe all safety notes and precautions detailed throughout this manual.
Page 45
TROUBLESHOOTING AND REPAIR F-26 F-26 SWITCH BOARD TEST PROCEDURE (continued) TABLE F.4 - SWITCH BOARD LED’s Description Indicates Light Conditions LED 1 +48VDC Supply Power applied to PW C300 LED 4 +15VDC Supply Power applied to PW C300 LED 3 Boost Circuit *When high input Active...
Page 46
TROUBLESHOOTING AND REPAIR F-27 F-27 SWITCH BOARD TEST PROCEDURE (continued) FIGURE F.7 - SWITCH BOARD LOCATION INVE RTE R CHO KE L12741 C HO PPE R CO NTRO L PCB PLANAR TRANSF O RME R INPUT C HO KE DC LINK CAPACITOR PRE-CHARGE RELAY G4770 SWITCHBOARD PCB...
Page 47
TROUBLESHOOTING AND REPAIR F-28 F-28 SWITCH BOARD TEST PROCEDURE (continued) FiGURE F.8 – SWITCH BOARD LED’s LED’S 5 THRU 10 LED 4 LED 1 LED 3 LED 11 LED’S 5 Thru 10 These six LED’s are used to indicate a turn-on of a chopper phase.
TROUBLESHOOTING AND REPAIR F-29 F-29 SWITCH BOARD TEST PROCEDURE (continued) TABLE F.5 – SWITCH BOARD VOLTAGE MEASUREMENTS Description Test Points Expected Reading Conditions Pre-Charge Relay Plug J41 Pin 6(-) 15VDC Correct input power Coil Voltage applied to machine Plug J41 Pin 5(+) and pre-charge completed.
Page 49
TROUBLESHOOTING AND REPAIR F-30 F-30 SWITCH BOARD TEST PROCEDURE (continued) TABLE F.6 – SWITCH BOARD RESISTANCE MEASUREMENTS Description Meter Test Points Expected Readings Conditions and Polarity 100 O hm Pre -Ch arge B10( +) 100 Ohms Machine “o ff” no Resistor input power applied B12 (-)
Page 50
TROUBLESHOOTING AND REPAIR F-31 F-31 SWITCH BOARD TEST PROCEDURE (continued) TABLE F.6 – SWITCH BOARD RESISTANCE MEASUREMENTS (continued) Full Bridge Low Sid e B37( +) To High Resistance Machine “o ff” no IGB Ts B49( -) Greate r than input power applied. Also 10,000 ohms The Pla nar...
Page 51
TROUBLESHOOTING AND REPAIR F-32 F-32 SWITCH BOARD TEST PROCEDURE (continued) FIGURE F.9 – SWITCH BOARD TEST POINTS INVERTER CHOKE PLUG J41 POWER WAVE® C300...
Page 52
POWER FACTOR CONTROL BOARD TEST PROCEDURE WARNING Service and repair should be performed only by Lincoln Electric factory trained personnel. Unauthorized repairs performed on this equipment may result in danger to the technician or machine operator and will invalidate your factory warranty. For your safety and to avoid electrical shock, please observe all safety notes and precautions detailed throughout this manual.
Page 53
TROUBLESHOOTING AND REPAIR F-34 F-34 POWER FACTOR CONTROL BOARD TEST PROCEDURE (continued) PROCEDURE 9. If further testing is required remove the input 1. Disconnect the input power to the POWER power to the machine and perform the resis- WAVE® C300 machine. tance checks in Table F.8.
TROUBLESHOOTING AND REPAIR F-35 F-35 POWER FACTOR CONTROL BOARD TEST PROCEDURE (continued) FIGURE F.10 – P.F.C. CONTROL BOARD LOCATION PF C CO NTRO L BO ARD E THE RNE T RE C E PTAC LE DC LINK C APAC ITO R PRE -C HARG E RE LAY INPUT C O RD G RIP G AS SO LE NO ID...
Page 55
TROUBLESHOOTING AND REPAIR F-36 F-36 POWER FACTOR CONTROL BOARD TEST PROCEDURE (continued) FIGURE F.11 – P.F.C. CONTROL BOARD PLUGS LED 1 LED 2 BUZZER G5915 P.F.C. CONTROL BOARD P.C. BOARD LED # COLOR FUNCTION GREEN 15 VDC POWER SUPPLY FUNCTION PROPERLY WHEN ON ERROR CODE (LED WILL FLASH ERROR AND BUZZER WILL SOUND) SEE TABLE BELOW FOR DETAILS •...
Page 56
TROUBLESHOOTING AND REPAIR F-37 F-37 POWER FACTOR CONTROL BOARD TEST PROCEDURE (continued) TABLE F.8 - POWER FACTOR CORRECTION CONTROL BOARD RESISTANCE CHECKS Description Meter Test Points Expected Readings Conditions and Polarity Auxiliary Power Receptacle J27 Pin Ver y High Input power Input Circuit 3 (-) resistance.
Page 57
TROUBLESHOOTING AND REPAIR F-38 F-38 POWER FACTOR CONTROL BOARD TEST PROCEDURE (continued) TABLE F8 - POWER FACTOR CORRECTION CONTROL BOARD RESISTANCE CHECKS (continued) Main Boost Gate Plug J23 Pin 8 (-) Resistance should Input power Drive be greater than 500 removed.
Page 58
TROUBLESHOOTING AND REPAIR F-39 F-39 POWER FACTOR CONTROL BOARD TEST PROCEDURE (continued) FIGURE F.12 – PLUG J23 PLUG J27 FIGURE F.13 – SWITCH BOARD TEST POINTS POWER WAVE® C300...
Page 60
CURRENT AND VOLTAGE CALIBRATION PROCEDURE WARNING Service and repair should be performed only by Lincoln Electric factory trained personnel. Unauthorized repairs performed on this equipment may result in danger to the technician or machine operator and will invalidate your factory warranty. For your safety and to avoid electrical shock, please observe all safety notes and precautions detailed throughout this manual.
Page 61
TROUBLESHOOTING AND REPAIR F-42 F-42 CURRENT AND VOLTAGE CALIBRATION PROCEDURE (continued) CALIBRATION SET-UP: 1. Load the Power Wave Manager Software into CALIBRATION PROCEDURE: the computer. 1. Once in the “Calibration” screen, make sure that the machine output is OFF (light is BLACK) 2.
Page 62
TROUBLESHOOTING AND REPAIR F-43 F-43 CURRENT AND VOLTAGE CALIBRATION PROCEDURE (continued) FIGURE F.14 – CALIBRATION SCREEN POWER WAVE® C300...
Page 64
USER INTERFACE BOARD TEST PROCEDURE WARNING Service and repair should be performed only by Lincoln Electric factory trained personnel. Unauthorized repairs performed on this equipment may result in danger to the technician or machine operator and will invalidate your factory warranty. For your safety and to avoid electrical shock, please observe all safety notes and precautions detailed throughout this manual.
Page 65
TROUBLESHOOTING AND REPAIR F-46 F-46 USER INTERFACE BOARD TEST PROCEDURE (continued) PROCEDURE 1. Disconnect the input power to the POWER WAVE® C300 machine. 2. To gain access to the User Interface Board test points first perform the Case Cover and DC Link Capacitor Discharge Procedure.
Page 66
TROUBLESHOOTING AND REPAIR F-47 F-47 USER INTERFACE BOARD TEST PROCEDURE (continued) POWER WAVE® C300...
Page 67
TROUBLESHOOTING AND REPAIR F-48 F-48 USER INTERFACE BOARD TEST PROCEDURE (continued) FIGURE F.15 – U.I. FRONT VIEW (G4760 Series) DISP 6 DISP 7 LED 11 LED 13 LED 14 LED 12 LED 15 LED 10 DISP 1 DISP 2 DISP 3 LED 9 LED 16 IR PORT...
Page 68
TROUBLESHOOTING AND REPAIR F-49 F-49 USER INTERFACE BOARD TEST PROCEDURE (continued) FIGURE F.16 – PLUG J5 LOCATION ON USER INTERFACE BOARD (rear view) 357 B 541 B PLUG J5 48 VDC 359 B 542 B NOTE: Leads connect to Plug J81 on the Feed head Board POWER WAVE®...
Page 70
INPUT RECTIFIER TEST PROCEDURE WARNING Service and repair should be performed only by Lincoln Electric factory trained personnel. Unauthorized repairs performed on this equipment may result in danger to the technician or machine operator and will invalidate your factory warranty. For your safety and to avoid electrical shock, please observe all safety notes and precautions detailed throughout this manual.
TROUBLESHOOTING AND REPAIR F-52 F-52 INPUT RECTIFIER TEST PROCEDURE (continued) FIGURE F.17 – INPUT RECTIFIER LOCATION C HO PPE R C O NTRO L BO ARD PLANA R T RANSF O RME R INPUT RECTIFIER TEST POINTS C URRE NT TRANSDUC E R O N/O F F SW ITC H PROCEDURE INPUT C HO K E...
Page 74
GAS SOLENOID TEST PROCEDURE WARNING Service and repair should be performed only by Lincoln Electric factory trained personnel. Unauthorized repairs performed on this equipment may result in danger to the technician or machine operator and will invalidate your factory warranty. For your safety and to avoid electrical shock, please observe all safety notes and precautions detailed throughout this manual.
Page 75
TROUBLESHOOTING AND REPAIR F-56 F-56 GAS SOLENOID TEST PROCEDURE (continued) PROCEDURE 10. If the correct solenoid voltage is not present at 1. Disconnect the input power to the POWER the solenoid terminals check for the correct WAVE® C300 machine. voltage at plug J83 pins 3 and 4 on the FeedHead PC Board.
Page 76
TROUBLESHOOTING AND REPAIR F-57 F-57 GAS SOLENOID TEST PROCEDURE (continued) FIGURE F.19 – GROUNDING LUG GROUNDING LUG HINGED COVER GAS SOLENOID TOP VIE W DE TAIL OF INPUT CO NNE CT ION FIGURE F.20 – PLUG J83 POWER WAVE® C300...
Page 78
PLANAR TRANSFORMER RESISTANCE TEST PROCEDURE WARNING Service and repair should be performed only by Lincoln Electric factory trained personnel. Unauthorized repairs performed on this equipment may result in danger to the technician or machine operator and will invalidate your factory warranty. For your safety and to avoid electrical shock, please observe all safety notes and precautions detailed throughout this manual.
Page 79
TROUBLESHOOTING AND REPAIR F-60 F-60 PLANAR TRANSFORMER RESISTANCE TEST PROCEDURE (continued) FIGURE F.21 - TEST POINTS INVERTER CHOKE PROCEDURE 1. Disconnect the input power to the POWER WAVE® C300 machine. 2. To gain access to the Planar Transformer test points first perform the Case Cover and DC Link Capacitor Discharge Procedure.
Page 80
TROUBLESHOOTING AND REPAIR F-61 F-61 PLANAR TRANSFORMER RESISTANCE TEST PROCEDURE (continued) TABLE F.12 – RESISTANCE CHECKS Test Points E xpected Resistance Comments Reading B 37 to B 41 Z er o ohms Continuity of Primary Winding B 39 to B 40 Z e r o ohms Continuity of Secondary Winding...
Page 82
FeedHead BOARD AND TACHOMETER FEEDBACK TEST PROCEDURE WARNING Service and repair should be performed only by Lincoln Electric factory trained personnel. Unauthorized repairs performed on this equipment may result in danger to the technician or machine operator and will invalidate your factory warranty. For your safety and to avoid electrical shock, please observe all safety notes and precautions detailed throughout this manual.
TROUBLESHOOTING AND REPAIR F-64 F-64 FeedHead BOARD AND TACHOMETER FEEDBACK TEST PROCEDURE (continued) TABLE F.13 – FeedHead BOARD TEST POINTS Description Test Points Lead Expected Conditions Numbers Readings Power Supply Plug J82 Pin 3 Lead 357(-) 48VDC Input power to Board applied to Plug 82 Pin4 Lead 359(+)
Page 86
WIRE DRIVE MOTOR TEST PROCEDURE WARNING Service and repair should be performed only by Lincoln Electric factory trained personnel. Unauthorized repairs performed on this equipment may result in danger to the technician or machine operator and will invalidate your factory warranty. For your safety and to avoid electrical shock, please observe all safety notes and precautions detailed throughout this manual.
Page 87
TROUBLESHOOTING AND REPAIR F-68 F-68 WIRE DRIVE MOTOR TEST PROCEDURE (continued) FIGURE F.23 – WIRE DRIVE MOTOR LOCATION PLUG P11 WIRE DRIVE MOTOR PROCEDURE 6. If the resistance measurements are correct in 1. Disconnect the input power to the POWER Step 5 then using the variable DC Power WAVE®...
Page 88
OUTPUT RECTIFIER TEST PROCEDURE WARNING Service and repair should be performed only by Lincoln Electric factory trained personnel. Unauthorized repairs performed on this equipment may result in danger to the technician or machine operator and will invalidate your factory warranty. For your safety and to avoid electrical shock, please observe all safety notes and precautions detailed throughout this manual.
Page 89
TROUBLESHOOTING AND REPAIR F-70 F-70 OUTPUT RECTIFIER TEST PROCEDURE (continued) FIGURE F.24 – TEST POINTS PROCEDURE open. 1. Disconnect the input power to the POWER WAVE® C300 machine. 5. If the Output Rectifier is faulty the entire Switch Board must be replaced. 2.
CURRENT TRANSDUCER TEST PROCEDURE WARNING Service and repair should be performed only by Lincoln Electric factory trained personnel. Unauthorized repairs performed on this equipment may result in danger to the technician or machine operator and will invalidate your factory warranty. For your safety and to avoid electrical shock, please observe all safety notes and precautions detailed throughout this manual.
TROUBLESHOOTING AND REPAIR F-72 F-72 CURRENT TRANSDUCER TEST PROCEDURE (continued) PROCEDURE 8. Connect a load bank (or 50 Ft. weld cable) to the Positive and Negative output terminals on 1. Disconnect the input power to the POWER the POWER WAVE® C 300. WAVE®...
TROUBLESHOOTING AND REPAIR F-73 F-73 CURRENT TRANSDUCER TEST PROCEDURE (continued) FIGURE F.25 – PLUG LOCATIONS ON CONTROL BOARD J12 - Chopper Control Board Communication J5 - Secondary Thermostat Connection Switch Bank 1 J6 - Primary Error Communications J7 - Inverter Shutdown Command Fan Control Status LED J8 - Current Feedback...
Page 93
TROUBLESHOOTING AND REPAIR F-74 F-74 CURRENT TRANSDUCER TEST PROCEDURE (continued) FIGURE F.26 – CURRENT TRANSDUCER LOCATION DIG ITA L C O NTRO L BO ARD F E E DHE A D BO A RD C URRE NT TRANSDUC E R TABLE F.14 Output Current (Actual) T r ansducer F eedback Voltage...
Page 94
TROUBLESHOOTING AND REPAIR F-75 F-75 CURRENT TRANSDUCER TEST PROCEDURE (continued) FIGURE F.27 – ETHERNET RECEPTACLE E THE RNE T RE C E P TAC LE POWER WAVE® C300...
REMOVAL AND REPLACEMENT PROCEDURE WARNING Service and repair should be performed only by Lincoln Electric factory trained personnel. Unauthorized repairs performed on this equipment may result in danger to the technician or machine operator and will invalidate your factory warranty. For your safety and to avoid electrical shock, please observe all safety notes and precautions detailed throughout this manual.
Page 97
TROUBLESHOOTING AND REPAIR F-78 F-78 POWER FACTOR CORRECTION CONTROL BOARD REMOVAL AND REPLACEMENT PROCEDURE (continued) FIGURE F.28 – CAPACITOR & P.F.C. CONTROL BOARD LOCATION PF C CO NTRO L BO ARD DC LINK C APAC ITO R PROCEDURE 5. Remove the five molex type plugs from the 1.
REMOVAL AND REPLACEMENT PROCEDURE WARNING Service and repair should be performed only by Lincoln Electric factory trained personnel. Unauthorized repairs performed on this equipment may result in danger to the technician or machine operator and will invalidate your factory warranty. For your safety and to avoid electrical shock, please observe all safety notes and precautions detailed throughout this manual.
Page 99
TROUBLESHOOTING AND REPAIR F-80 F-80 CURRENT TRANSDUCER (LEM) REMOVAL AND REPLACEMENT PROCEDURE (continued) FIGURE F.29 – CURRENT TRANSDUCER LOCATION O UT PUT C HO KE C URRE NT TRANSDUC E R O N/O F F SW ITC H PROCEDURE INPUT C HO K E 7.
CONTROL BOARD REMOVAL AND REPLACEMENT PROCEDURE WARNING Service and repair should be performed only by Lincoln Electric factory trained personnel. Unauthorized repairs performed on this equipment may result in danger to the technician or machine operator and will invalidate your factory warranty. For your safety and to avoid electrical shock, please observe all safety notes and precautions detailed throughout this manual.
TROUBLESHOOTING AND REPAIR F-82 F-82 CONTROL BOARD REMOVAL AND REPLACEMENT PROCEDURE (continued) FIGURE F.30 – CONTROL BOARD LOCATION DIG ITA L C O NTRO L BO ARD F E E DHE A D BO A RD PROCEDURE 7. Install the new board and replace the molex 1.
TROUBLESHOOTING AND REPAIR F-83 F-83 CONTROL BOARD REMOVAL AND REPLACEMENT PROCEDURE (continued) FIGURE F.31 – BOARD PLUG REMOVAL Switch J12 - Chopper Control Board Communication Bank 2 CAN Communication - J11 J5 - Secondary Thermostat Connection Switch Bank 1 J6 - Primary Error Communications +48 Volt DC Connection - J4 J7 - Inverter Shutdown Command Fan Control...
Page 104
FeedHead BOARD REMOVAL AND REPLACEMENT PROCEDURE WARNING Service and repair should be performed only by Lincoln Electric factory trained personnel. Unauthorized repairs performed on this equipment may result in danger to the technician or machine operator and will invalidate your factory warranty. For your safety and to avoid electrical shock, please observe all safety notes and precautions detailed throughout this manual.
Page 105
TROUBLESHOOTING AND REPAIR F-86 F-86 FeedHead BOARD REMOVAL AND REPLACEMENT PROCEDURE (continued) FIGURE F.32 – FeedHead BOARD LOCATION F E E DHE A D BO A RD PROCEDURE 7. If a spool gun board is plugged into the 1. Disconnect the input power to the POWER FeedHead Board carefully remove it.
Page 106
SWITCH BOARD ASSEMBLY REMOVAL AND REPLACEMENT PROCEDURE WARNING Service and repair should be performed only by Lincoln Electric factory trained personnel. Unauthorized repairs performed on this equipment may result in danger to the technician or machine operator and will invalidate your factory warranty. For your safety and to avoid electrical shock, please observe all safety notes and precautions detailed throughout this manual.
Page 110
WIRE DRIVE ASSEMBLY REMOVAL AND REPLACEMENT PROCEDURE WARNING Service and repair should be performed only by Lincoln Electric factory trained personnel. Unauthorized repairs performed on this equipment may result in danger to the technician or machine operator and will invalidate your factory warranty. For your safety and to avoid electrical shock, please observe all safety notes and precautions detailed throughout this manual.
TROUBLESHOOTING AND REPAIR F-92 F-92 WIRE DRIVE ASSEMBLY REMOVAL AND REPLACEMENT PROCEDURE (continued) FIGURE F.35 – WIRE DRIVE ASSEMBLY LOCATION WIRE DRIVE MOUNTING ASSEMBLY NUTS GUT TRIGGER RECEPTACLE (2 SCREWS) POSITIVE OUTPUT HOSE TERMINAL CONNECTION PROCEDURE 5. Using the 11/16 inch wrench remove the gas 1.
Page 112
TROUBLESHOOTING AND REPAIR F-93 F-93 WIRE DRIVE ASSEMBLY REMOVAL AND REPLACEMENT PROCEDURE (continued) 8. Carefully place the new Wire Drive Assembly into position and connect Plug J83 into the wiring harness. 9. Mount the gun trigger receptacle into the Wire Drive Assembly.
Page 114
USER INTERFACE BOARD REMOVAL AND REPLACEMENT PROCEDURE WARNING Service and repair should be performed only by Lincoln Electric factory trained personnel. Unauthorized repairs performed on this equipment may result in danger to the technician or machine operator and will invalidate your factory warranty. For your safety and to avoid electrical shock, please observe all safety notes and precautions detailed throughout this manual.
TROUBLESHOOTING AND REPAIR F-96 F-96 USER INTERFACE BOARD REMOVAL AND REPLACEMENT PROCEDURE (continued) PROCEDURE 12. Remove the bypass grounding assembly from 1. Disconnect the input power to the POWER the User Interface Board. WAVE® C300 machine. 13. Locate and remove the other two slot head 2.
Page 116
TROUBLESHOOTING AND REPAIR F-97 F-97 USER INTERFACE BOARD REMOVAL AND REPLACEMENT PROCEDURE (continued) FIGURE F.36 – USER INTERFACE BOARD LOCATION USER INTERFACE BOARD PF C CO NTRO L BO ARD DC LINK C APAC ITO R POWER WAVE® C300...
Page 117
TROUBLESHOOTING AND REPAIR F-98 F-98 USER INTERFACE BOARD REMOVAL AND REPLACEMENT PROCEDURE (continued) FIGURE F.37 – KNOBS FOUR SCREWS THREE KNOBS POWER WAVE® C300...
Page 118
TROUBLESHOOTING AND REPAIR F-99 F-99 USER INTERFACE BOARD REMOVAL AND REPLACEMENT PROCEDURE (continued) FIGURE F.38 – USER INTERFACE BOARD COVER PLATE USER INTERFACE BOARD COVER PLATE POWER WAVE® C300...
Lincoln Electric Service Department for electrical trou- bleshooting assistance before you proceed. Call 1-888-935-3877. TEST DESCRIPTION This procedure will aid the technician in testing the Power Wave C300 output after the repair or replacement of a part or PC board. MATERIALS NEEDED...
CHOPPER MODULE OUTPUT TEST WARNING Service and repair should be performed by only Lincoln Electric factory trained personnel. Unauthorized repairs performed on this equipment may result in danger to the technician or machine operator and will invalidate your factory warranty. For your safety and to avoid electrical shock, please observe all safety notes and precautions detailed throughout this manual.
Page 123
TROUBLESHOOTING AND REPAIR F-104 F-104 CHOPPER MODULE OUTPUT TEST (continued) FIGURE F.39 – CHOPPER MODULE OUTPUT TEST PROCEDURE Test Acceptable Component Lead 1. Perform the Case Cover Removal Procedure Point Value Tested 2. Connect the output terminals to a load bank Positive Machine Output 300A 3.
SWITCHBOARD PC BOARD, CHANGED "LED11" TO "LED2". PFC CONTROL CONTROL P.C. BOARD P.C. BOARD P.C. BOARD Description of LED functions on Power Wave C300 Description of LED functions For reference only on Power Wave C300 INPUT CONTROL & PWR G5915-1 For reference only G4770 SWITCHBOARD P.C.
Page 127
ELECTRICAL DIAGRAMS SCHEMATIC - COMPLETE MACHINE (G6052) FOOT AMPTROL CAVITY NUMBERING SEQUENCE CONNECTOR (VIEWED FROM COMPONENT SIDE OF P.C. BOARD) J10A1, J9, J13, J26, J2, J5, J11, J10B1, J27, J83,J88 (VIEWED FROM REAR) J81, J82 J811 CONTROL BOARD J8, J24, G4800 J3, J4, J28, J43,...
Page 128
ELECTRICAL DIAGRAMS SCHEMATIC - CONTROL PC BOARD (G4799) (PG. 1 OF 13) NOTE: This diagram is for reference only. It may not be accurate for all machines covered by this manual. POWER WAVE® C300...
Page 129
ELECTRICAL DIAGRAMS SCHEMATIC - CONTROL PC BOARD (G4799) (PG. 2 OF 13) NOTE: This diagram is for reference only. It may not be accurate for all machines covered by this manual. POWER WAVE® C300...
Page 130
ELECTRICAL DIAGRAMS SCHEMATIC - CONTROL PC BOARD (G4799) (PG. 3 OF 13) NOTE: This diagram is for reference only. It may not be accurate for all machines covered by this manual. POWER WAVE® C300...
Page 131
ELECTRICAL DIAGRAMS SCHEMATIC - CONTROL PC BOARD (G4799) (PG. 4 OF 13) NOTE: This diagram is for reference only. It may not be accurate for all machines covered by this manual. POWER WAVE® C300...
Page 132
ELECTRICAL DIAGRAMS SCHEMATIC - CONTROL PC BOARD (G4799) (PG. 5 OF 13) NOTE: This diagram is for reference only. It may not be accurate for all machines covered by this manual. POWER WAVE® C300...
Page 133
ELECTRICAL DIAGRAMS G-10 G-10 SCHEMATIC - CONTROL PC BOARD (G4799) (PG. 6 OF 13) NOTE: This diagram is for reference only. It may not be accurate for all machines covered by this manual. POWER WAVE® C300...
Page 134
ELECTRICAL DIAGRAMS G-11 G-11 SCHEMATIC - CONTROL PC BOARD (G4799) (PG. 7 OF 13) NOTE: This diagram is for reference only. It may not be accurate for all machines covered by this manual. POWER WAVE® C300...
Page 135
ELECTRICAL DIAGRAMS G-12 G-12 SCHEMATIC - CONTROL PC BOARD (G4799) (PG. 8 OF 13) NOTE: This diagram is for reference only. It may not be accurate for all machines covered by this manual. POWER WAVE® C300...
Page 136
ELECTRICAL DIAGRAMS G-13 G-13 SCHEMATIC - CONTROL PC BOARD (G4799) (PG. 9 OF 13) NOTE: This diagram is for reference only. It may not be accurate for all machines covered by this manual. POWER WAVE® C300...
Page 137
ELECTRICAL DIAGRAMS G-14 G-14 SCHEMATIC - CONTROL PC BOARD (G4799) (PG. 10 OF 13) NOTE: This diagram is for reference only. It may not be accurate for all machines covered by this manual. POWER WAVE® C300...
Page 138
ELECTRICAL DIAGRAMS G-15 G-15 SCHEMATIC - CONTROL PC BOARD (G4799) (PG. 11 OF 13) NOTE: This diagram is for reference only. It may not be accurate for all machines covered by this manual. POWER WAVE® C300...
Page 139
ELECTRICAL DIAGRAMS G-16 G-16 SCHEMATIC - CONTROL PC BOARD (G4799) (PG. 12 OF 13) NOTE: This diagram is for reference only. It may not be accurate for all machines covered by this manual. POWER WAVE® C300...
Page 140
ELECTRICAL DIAGRAMS G-17 G-17 SCHEMATIC - CONTROL PC BOARD (G4799) (PG. 13 OF 13) NOTE: This diagram is for reference only. It may not be accurate for all machines covered by this manual. POWER WAVE® C300...
Page 141
ELECTRICAL DIAGRAMS G-18 G-18 SCHEMATIC - INPUT CONTROL PC BOARD (G5914) (PG. 1 OF 3) NOTE: This diagram is for reference only. It may not be accurate for all machines covered by this manual. POWER WAVE® C300...
Page 142
ELECTRICAL DIAGRAMS G-19 G-19 SCHEMATIC - INPUT CONTROL PC BOARD (G5914) (PG. 2 OF 3) NOTE: This diagram is for reference only. It may not be accurate for all machines covered by this manual. POWER WAVE® C300...
Page 143
ELECTRICAL DIAGRAMS G-20 G-20 SCHEMATIC - INPUT CONTROL PC BOARD (G5914) (PG. 3 OF 3) NOTE: This diagram is for reference only. It may not be accurate for all machines covered by this manual. POWER WAVE® C300...
Page 144
ELECTRICAL DIAGRAMS G-21 G-21 SCHEMATIC - 3 STAGE INVERTER PC BOARD (G4769) (PG. 1 OF 2) NOTE: This diagram is for reference only. It may not be accurate for all machines covered by this manual. POWER WAVE® C300...
Page 145
ELECTRICAL DIAGRAMS G-22 G-22 SCHEMATIC - 3 STAGE INVERTER PC BOARD (G4769) (PG. 2 OF 2) NOTE: This diagram is for reference only. It may not be accurate for all machines covered by this manual. POWER WAVE® C300...
Page 146
ELECTRICAL DIAGRAMS G-23 G-23 SCHEMATIC - F.R.E.D. PC BOARD (G4758) (PG. 1 OF 7) NOTE: This diagram is for reference only. It may not be accurate for all machines covered by this manual. POWER WAVE® C300...
Page 147
ELECTRICAL DIAGRAMS G-24 G-24 SCHEMATIC - F.R.E.D. PC BOARD (G4758) (PG. 2 OF 7) NOTE: This diagram is for reference only. It may not be accurate for all machines covered by this manual. POWER WAVE® C300...
Page 148
ELECTRICAL DIAGRAMS G-25 G-25 SCHEMATIC - F.R.E.D. PC BOARD (G4758) (PG. 3 OF 7) NOTE: This diagram is for reference only. It may not be accurate for all machines covered by this manual. POWER WAVE® C300...
Page 149
ELECTRICAL DIAGRAMS G-26 G-26 SCHEMATIC - F.R.E.D. PC BOARD (G4758) (PG. 4 OF 7) NOTE: This diagram is for reference only. It may not be accurate for all machines covered by this manual. POWER WAVE® C300...
Page 150
ELECTRICAL DIAGRAMS G-27 G-27 SCHEMATIC - F.R.E.D. PC BOARD (G4758) (PG. 5 OF 7) NOTE: This diagram is for reference only. It may not be accurate for all machines covered by this manual. POWER WAVE® C300...
Page 151
ELECTRICAL DIAGRAMS G-28 G-28 SCHEMATIC - F.R.E.D. PC BOARD (G4758) (PG. 6 OF 7) NOTE: This diagram is for reference only. It may not be accurate for all machines covered by this manual. POWER WAVE® C300...
Page 152
ELECTRICAL DIAGRAMS G-29 G-29 SCHEMATIC - F.R.E.D. PC BOARD (G4758) (PG. 7 OF 7) NOTE: This diagram is for reference only. It may not be accurate for all machines covered by this manual. POWER WAVE® C300...
Page 153
ELECTRICAL DIAGRAMS G-30 G-30 SCHEMATIC - 42 VOLT & ARCLINK FEEDER PC BOARD (G3883) (PG. 1 OF 2) NOTE: This diagram is for reference only. It may not be accurate for all machines covered by this manual. POWER WAVE® C300...
Page 154
ELECTRICAL DIAGRAMS G-31 G-31 SCHEMATIC - 42 VOLT & ARCLINK FEEDER PC BOARD (G3883) (PG. 2 OF 2) NOTE: This diagram is for reference only. It may not be accurate for all machines covered by this manual. POWER WAVE® C300...
Page 155
ELECTRICAL DIAGRAMS G-32 G-32 SCHEMATIC - SPOOL GUN PC BOARD (L12008) NOTE: This diagram is for reference only. It may not be accurate for all machines covered by this manual. POWER WAVE® C300...