Direction 5936427, Rev. 1
Chapter 2
Site Preparations
Section 2-1
Overview
2-1-1
Purpose of this chapter
This chapter provides the information required to plan and prepare for the setup of a LOGIQ Totus.
Included are descriptions of the facility and electrical needs to be met by the purchaser of the
LOGIQ Totus.
NOTE:
The information in this Service Manual is applicable to LOGIQ Totus.
2-1-2
Contents in this chapter
2-1
2-2
2-3
GE HealthCare CONFIDENTIAL
Overview. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1
General LOGIQ Totus Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-2
Facility Needs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-9
Chapter 2 Site Preparations
LOGIQ Totus Basic Service Manual
2 - 1