Chapter 2: Site Preparations; Overview; Purpose Of Chapter 2 - GE Venue Fit Technical Publication

Table of Contents

Advertisement

P R E L I M I N A R Y
DIRECTION 5854713-100, REVISION 2
Chapter 2
Site Preparations
Section 2-1

Overview

2-1-1

Purpose of Chapter 2

This chapter provides the information required to plan and prepare for the setup of a Venue Fit™
ultrasound unit. Included are descriptions of the electrical and facility requirements that must be met by
the purchaser. A worksheet is provided at the end of this chapter (see
all the required network information is available, prior to setup.
Chapter 2 - Site Preparations
VENUE FIT™ SERVICE MANUAL
Figure
2-3) to help ensure that
2-1