Facility Needs

Contents in this section
2-3-1
2-3-2
2-3-3
2-3-4
2-3-5
2-3-6
2-3-7
2-3-1

Purchaser responsibilities

The work and materials needed to prepare the site are the responsibility of the purchaser. Delay,
confusion, and waste of manpower can be avoided by completing pre-installation work before delivery.
Purchaser responsibility includes:
Procuring the materials required.
Completing the preparations before delivery of the LOGIQ Totus.
Paying the costs for any alterations and modifications not specifically provided in the sales contract.
NOTE:
All electrical installations that are preliminary to the positioning of the equipment at the site
prepared for the equipment must be performed by licensed electrical contractors. Other
connections between pieces of electrical equipment, calibrations, and testing must also be
performed by qualified personnel. The products involved (and the accompanying electrical
installations) are highly sophisticated and special engineering competence is required. All
electrical work on these products must comply with the requirements of applicable electrical
codes. The purchaser of GE HealthCare equipment must only utilize qualified personnel to
perform electrical servicing on the equipment.
The desire to use a non–listed or customer provided product or to place an approved product further
from the LOGIQ Totus than the interface kit allows, presents challenges to the installation team. To
avoid delays during installation, such variances should be made known to the individuals or group
performing the installation at the earliest possible date (preferably prior to the purchase).
The ultrasound suite must be clean prior to delivery of the machine. Carpet is not recommended
because it collects dust and creates static. Potential sources of EMI (electromagnetic interference)
should also be investigated before delivery. Dirt, static, and EMI can negatively impact LOGIQ Totus
reliability.
GE HealthCare CONFIDENTIAL
Purchaser responsibilities. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-9
Required facility needs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-10
Desirable features . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-11
Minimal floor plan suggestions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-11
Networking setup requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-13
Privacy and security . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-15
Environmental dangers. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-15
Chapter 2 Site Preparations
LOGIQ Totus Basic Service Manual
2 - 9

Advertisement

Table of Contents
loading

Table of Contents