Installation Mechanical
Attachment to the factory structure is allowed but not a
requirement. If an attachment to the factory base is
required, the factory recommends bolting the chiller base
frame to the mounting equipment. If that is not going to be
possible on site, then the base of the chiller can be welded
at the point load locations. If welding is to be done, the
1
FRONT
2235
OF UNIT
5
305
POINT
1
1800
14
3
THRU
4
BOTTOM FLANGE
2540
2
3
4
2800
3500
installer should take caution to avoid any defection of the
main beam. Additionally, it is advised that any weld should
be cleaned and be cold-galvanized on site to help avoid
corrosion of that section. Corrosion of the base rail on
welded sections would be void of any Trane warranty.
8204
2
2515
5
3400
3
4
8
2540
8
1500
ARTC-SVX013A-EN
85 1
2
1 1
4
32