Start Up
Table 10. POE Oil recharge amount (fl. oz.)
C1
Model
25mm/18mm
TS*150
56/105.6
TH*150
56
TH*150 Reheat
56
TS*180/155
112/182.4
TH*180
81
TH*180 Reheat
56
TSH210, TS*175
112/182.4
TS*210/175
112
TH*210
81
TH*210 Reheat
102
TS*240/200
112
TH*240
112
TH*240 Reheat
112
TS*300/250
112
(a)
TH*300
76
(a) This is the total amount for both compressors (38oz per com-
pressor).
2. After the compressor and condenser fan have started
and operated for approximately 30 minutes, observe
the operating pressures. Compare the operating
pressures to the operating pressure curve in the
Service Facts.
3. Check system subcooling. Follow the instruction listed
on the subcooling charging curve in the Service Facts.
4. Repeat
Step 1
through
circuit.
5. To stop the SERVICE TEST, turn the main power
disconnect switch to the "Off" position or proceed to
the next component start-up proc
6. edure. Remove electro mechanical test mode
connections (if applicable).

Dehumidification Option

Momentarily jump across the Test 1 and Test 2 terminals of
the LTB1 until the unit enters test mode 7.
Once the unit is in the reheat test mode, verify that the
three-way valve has shifted to the reheat position and that
the supply temperature rises 10°F more than when in
cooling mode stage 2. Monitor the suction pressure for 15
minutes. The suction pressure should remain within 5 psi
of normal cooling operation.

Heating Start-Up

1. Clamp an amp meter around one of 1
power wires at the heater contactor.
36
C2
25mm/18mm
62/99.2
38
56
62 (62)/96
38
56
38 (62)/96
38 (62)
38
56
56
38
112
106
81
Step 3
for each refrigerant
(Table 8, p.
st
stage heater
2. ReliaTel Control Using the Service Test Guide in
Table 8, p.
34, continue the SERVICE TEST start-up
procedure for each compressor circuit.
Momentarily jump across the Test 1 and Test 2
terminals on LTB one additional time if continuing
from previous component start-up or until the desired
start-up component test is started.
3. Verify that the heater stage is operating properly.
4. Clamp an amp meter around one of 2
power wires at the heater contactor (if applicable).
5. ReliaTel Control Using the Service Test Guide in
Table 8, p.
34, continue the SERVICE.
6. TEST start-up procedure for each compressor circuit.
Momentarily jump across the Test 1 and Test 2
terminals on LTB one additional time if continuing
from previous component start-up or until the desired
start-up component test is started.
7. Verify that the heater stage is operating properly.
8. To stop the SERVICE TEST, turn the main power
disconnect switch to the "Off" position or proceed to
the next component start-up procedure. Remove
electro mechanical test mode connections (if
applicable).
Variable Air Volume Applications
(Multi-zone, Traditional VAV)
Traditional VAV Standalone Operation
If a traditional VAV unit is required to operate without ICS,
BAS, or other "front end" controller, a jumper must be
placed between J6-2 and J6-4 of the RTRM to allow local
standalone control.
Supply Air Temperature Control -
Occupied Cooling and Heating
The RTRM is designed to maintain a selectable supply air
temperature of 40ºF to 80ºF with a +/- 3.5ºF deadband. To
reduce the risk of coil freezing, it is not recommended to
set the supply air temperature below 50ºF . In cooling
mode, if the supply air temperature is more than 3.5ºF
34)
warmer than the selected temperature, a stage of cooling
will be turned 'on' (if available). Also, if the supply air
temperature is more than 3.5ºF cooler than the selected
temperature, a stage of cooling will be turned 'off'. At very
low airflow, the unit may cycle stages 'on' and 'off' to
maintain an average discharge air temperature outside the
7 degrees deadband.
The RTRM utilizes a proportional and integral control
scheme with the integration occurring when the supply air
temperature is outside the deadband. As long as the
supply air temperature is within the setpoint deadband,
the system is considered to be satisfied and no staging up
or down will occur.
nd
stage heater
RT-SVX25J-EN