GE PGP953 Installation Instructions Manual page 7

30” sealed gas cooktop
Table of Contents

Advertisement

Available languages

Available languages

Installation Instructions
[5] CHECK FOR LEAKS
LEAK TESTING OF THE APPLIANCE SHALL BE
CONDUCTED ACCORDING TO THE MANUFACTURER'S
INSTRUCTIONS.
Before testing for leaks, make sure all burner knobs
are in the OFF position.
After connecting the cooktop to gas, check system
for leaks with a manometer. If a manometer is not
available, turn the gas supply on to the cooktop
and use a liquid leak detector at all joints and
connections to check for leaks.
Tighten all connections if necessary to prevent gas
leakage in the cooktop or supply line.
DO NOT USE OPEN FLAME TO CHECK FOR
LEAKS!
Disconnect the cooktop and its individual shut-off
valve from the gas supply piping system during any
pressure testing of that system at test pressures
greater than 1/2 psig (3.5 kPa).
Isolate the cooktop from the gas supply piping
system by closing its individual shut-off valve
during any pressure testing of the gas supply
system at test pressures equal to or less than 1/2
psig (3.5 kPa).
[6] INSTALLATION OVER BUILT-IN
OVEN
See built-in oven installation for complete
installation instructions.
|
5" To Center of
2" Dia. Hole From
Countertop
La
|
90° Elbow —
—-Y
2" Dia. Hole
L-
(20 7/8" from front
of Countertop to
Cabinet Sides
~
7
SN
Hole Center}
View from Front of Cooktop

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pgp959Cgp350

Table of Contents