Information on siting
!
Please note
To prevent material damage, site the DHW cylin-
der in a room free from the risk of frost and
draughts.
Alternatively, drain the DHW cylinder when not
in use and there is a risk of frost.
Use the adjustable feet to level the DHW cylinder.
Siting a DHW cylinder with an immersion heater EHE
a
Fig. 5
Example: 300 l capacity
(cont.)
Note
Only use one or two of the adjustable feet to level the
DHW cylinder. At least one of the adjustable feet must
remain fully screwed in.
Fig. 4
Do not extend the adjustable feet beyond a total
length of 35 mm.
Immersion heater EHE installation instructions
Maintain the minimum clearance.
Cylinder capacity
in l
300
500
Note
The unheated length of any threaded immersion
heater installed on site must be at least 100 mm.

Preparing for installation

≤35
Dim. a
in mm
min. 730
min. 670