BMW i4 GRAN COUPE Owner's Manual page 308

Table of Contents

Advertisement

MOBILITY
Preparing the tire repair set
1.
Insert the sealant bottle into the mount on
the housing of the compressor.
2.
Turn the sealant bottle clockwise by 90° to
the stop.
3.
Connect the filler hose to the outlet of the
sealant bottle and turn clockwise by 90° to
the stop.
308
Wheels and tires
Online Edition for Part no. 01405A88AA4 - VI/23
4.
Unscrew the valve cap from the wheel and
screw the connecting piece of the filler hose
onto the valve.
5.
With the compressor switched off, insert the
connector into the power socket in the vehi-
cle interior.
Filling the tire with sealing
compound
Safety information
NOTICE
The compressor can overheat during ex-
tended operation. There is a risk of damage
to property. Do not run the compressor for
more than 10 minutes.
Filling the tire with sealing compound
1.
With standby state or drive-ready state
switched on, switch on the compressor.
Let the compressor run for max. 10 minutes
to fill in the tire sealant and reach a tire
pressure of 2.5 bar/36 psi.
While the tire is being filled with tire sealant,
the tire pressure can briefly reach approx.
OwnersManuals2.com

Advertisement

Table of Contents
loading

Table of Contents