5.1.3 Emergency Failure

During an examination, any operator can encounter two main cases of failures.
Main power supply cut
In this case, refer to
5.4.1 Physical Runs on page
Partial UPS Fluoro (option)
A Fluoro UPS (20 kVA) has been designed for systems with 21 & 31 cm detector. This partial UPS lets the
customer complete an exam in fluoro mode in case of a power failure. The autonomy provided by this
UPS is 5 minutes of fluoro every 24 hours.
WARNING
DO NOT CONNECT THE UPS BATTERIES PRIOR THE COMMISSIONING OF THE UPS
(INITIAL POWER UP).
NOTICE
General safety instructions
• Move the UPS in an upright position in its original package to the final
destination room. To lift the cabinets, use a forklift or lifting belts with spreader
bars.
• Check for sufficient floor and elevator loading capacity.
• Check the integrity of the UPS equipment carefully.
• If you notice visible damage, do not install or start the UPS. Contact the
nearest Service Center immediately. WARNING! RISK OF ELECTRICAL SHOCK:
Do not remove covers; there are no user serviceable parts inside.
• All installation, maintenance and service work should be performed by
qualified service personnel. The UPS contains its own energy source (battery).
• The field–wiring terminals may be electrically live, even when the UPS is
disconnected from the utility.
• Dangerous voltages may be present during battery operation. The battery
must be disconnected during maintenance or service work.
• This UPS contains potentially hazardous voltages.
• Be aware that the inverter can restart automatically after the utility voltage is
restored.