System Operation; System Start-Up - Toshiba GSC1000-C Operation Manual

Substation automation system
Table of Contents

Advertisement

System Operation

3
This Chapter describes the operation of start/stop, HMI log-in/log-out, setting of log-out
time and password change.
Refer to Appendix B for frequently asked questions on the system.
3.1
Please confirm that USB key is inserted to OWS/EWS.
Do not turn on the Station Computer at Step 2.
Following are the start-up procedure of the system. (Refer to Figure 3.1.1.)
Step 1. Turn on the bay level equipment.
Step 2. Turn on the server panels. (See NOTE)
Step 3. Turn on the common panels.
Step 4. Turn on the hard copy printer and log printer.
Step 5. Turn on the Station Computers.
Step 6. Turn on the OWS and EWS finally. (See NOTE)
OWS
EWS
Log
Hard Copy
Printer
Printer
ESW
ESW
BCU
BCU
GIS Local Control Panels
Bay level equipment

System Start-up

Remote
Monitoring
Modem Router
GPS
Time server
Station
Computer
ESW
ESW
ESW
BCU
Figure 3.1.1 An example of System configuration
Station
Computer
ESW
Server Panels
Relay
IFU
Relay
Relay
Relay
Relay
Protection Relay Panels
20
BCU
BCU
BCU
ESW
ESW
ESW
Common Panels
ESW
Relay
IFU
IFU
Relay
Relay
Relay
6F2M2000
Step 6
Step 5
Step 4
Step 3
Step 2
Step 1

Advertisement

Table of Contents
loading

Table of Contents