Daikin Si12-992 Service Manual page 30

Table of Contents

Advertisement

Removal of PCB
Step
7
Remove the 7 screws.
Lift up the back side
8
slightly and release the
hooks of the front.
9
Release the lead wires
from the hook and
remove the terminal
boards.
28
Procedure
Terminal board
(R9964)
(R9965)
When reassembling, make
sure that the hooks of the
electrical box are placed on
the PCB.
(R7603)
(R9966)
Si12-992
Points
Removal Procedure

Advertisement

Table of Contents
loading

Table of Contents