After Operation; After Operation Safety; Charging The Battery Packs - Toro eTimeCutter 75841 Operator's Manual

42in or 54in riding mower
Table of Contents

Advertisement

After Operation

After Operation Safety

• Disengage the PTO whenever you are transporting or not using the machine.
• Use full-width ramps for loading the machine into a trailer or truck.
• Tie the machine down securely using straps, chains, cable, or ropes. Both front and rear
straps should be directed down and outward from the machine.
• Replace all worn, damaged, or missing parts and decals. Keep all fasteners tight to
ensure that the machine is working properly.

Charging the Battery Packs

The battery pack is not fully charged when you purchase it. Before using the machine
for the first time, place the battery pack in the charger and charge it until the LED
display indicates the battery pack is fully charged. Read all safety precautions.
Charge the battery pack only in temperatures that are within the appropriate range;
refer to
Specifications, page
Note:
At any time, press the battery-charge-indicator button on the battery pack to display
the current charge (LED indicators).
1. Ensure that the vents on the battery pack and charger are clear of any dust and debris.
Operation: After Operation
IMPORTANT
IMPORTANT
3–6.
G448708
Page 4–16
Battery pack cavity
Battery pack venting areas
Battery pack terminals
Battery-charge-indicator button
LED indicators (current charge)
Handle
Charger
3463-565 A

Advertisement

Table of Contents
loading

This manual is also suitable for:

Etimecutter 75851

Table of Contents