Download Print this page

Yaesu FT-901DM Maintenance Service Manual page 63

Hide thumbs Also See for FT-901DM:

Advertisement

SERVICING
FM
UNIT INSTALLATION
FOR
FT-901DE/SD
The FM Unit operation for the FT-901DE and SD
models can be installed in a matter of minutes.
Remove
the top cover of the transceiver, and re-
move
the black cover of the circuit board
rack
(left-hand side of the transceiver).
Install the FM Unit in the 22-pin connector. The
component
side of the circuit board should be on
the side facing the VFO enclosure. Use the two
circuit board
restraining clips to secure the board
in place, securing
the clips to the main circuit
board rack with the two screws included with the
kit.
The positions of the alignment potentiometers of
interest can be found by referring to Fig. 2.
'Oo,
ch
os | oS
(e)
vR901
VR903
vR902
Replace
the circuit
board cover, and replace the
RSH
TSE:
(EVENS
top cover
of the transceiver.
Installation
is now
complete.
| ae
Circuit board cover
(Remove)
|
"ay
ya
ras
Ao
Top cover
(Remove)
FIG-2
Alignment potentiometers
T
Restraining clip
|
FIG-4
FM UNIT
Component side

Advertisement

loading