Figure 3-2 Tightening Torques For Contact Nuts And Mounting Bolts - Siemens 1PH728 Series Operating Instructions Manual

Three-phase induction motor
Hide thumbs Also See for 1PH728 Series:
Table of Contents

Advertisement

1
2

Figure 3-2 Tightening torques for contact nuts and mounting bolts

(1) Contact nut
(2) Mounting bolt
Principles of entering and laying cables
Lead in permanently laid entries using EMC cable glands. Screw the cable glands
into the threaded holes in the unscrewable entry plate.
Arrange the exposed connecting cables in the terminal box such that the PE
conductor has excess length and the insulation of the cable strands cannot be
damaged.
Note
We recommend you use shielded cables, whose shields are conductively
connected to a large area of the metal terminal box of the motor (with an EMC
cable gland made of metal).
Notice
Unused threads must be sealed with a metallic screw plug.
SIEMENS AG - Operating Instructions
Three-phase induction motor 1PH728.
Nm
Installation / Assembly
3-7

Advertisement

Table of Contents
loading

Table of Contents